External Consultant Involvement for Organizational Capability Building in Complex Construction Projects: A Perspective from Interorganizational Learning Process

被引:4
作者
Hu, Yi [1 ]
Liu, Mingqiang [2 ]
Le, Yun [1 ]
Skitmore, Martin [3 ]
机构
[1] Tongji Univ, Sch Econ & Management, Dept Construct Management & Real Estate, 1239 Siping Rd, Shanghai 200092, Peoples R China
[2] Tongji Univ, Peoples Hosp 10, Dept Construct Management, 301 Yanchang Middle Rd, Shanghai 200072, Peoples R China
[3] Bond Univ, Fac Soc & Design, Ctr Comparat Construct Res, 14 Univ Dr, Robina, Qld 4226, Australia
基金
中国国家自然科学基金;
关键词
External consultant; Complex construction project (CCP); Organizational capability; Management innovation; ABSORPTIVE-CAPACITY; MANAGEMENT INNOVATION;
D O I
10.1061/(ASCE)CO.1943-7862.0002216
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
External management consultants have been increasingly employed by owners of complex construction projects (CCPs) to foster management innovation and improve their organizational capability. However, the dynamics of the owner-consultant collaboration process in such projects are still unknown. To bridge this gap, this paper explores the roles of external consultant involvement in fostering management innovation and developing an organizational capability in CCPs. Based on survey data collected from 102 such projects across different types in China, the partial least square-structural equation modeling analysis results uncover the positive effect of external consultant involvement in creating management innovation and building organizational capability. In particular, the mediating role of management innovation is identified in the exploration and transformation learning processes with external consultants involved. The findings of this study provide a novel explanation for the creation of management innovation in CCPs through external consultant involvement and useful guidance to project owners to better identify and utilize external consultants in the future. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 40 条
[1]   Innovation activities, use of appropriation instruments and absorptive capacity:: Evidence from Spanish firms [J].
Arbussa, Anna ;
Coenders, Germa .
RESEARCH POLICY, 2007, 36 (10) :1545-1558
[2]   Project complexity and team-level absorptive capacity as drivers of project management performance [J].
Bjorvatn, Torbjorn ;
Wald, Andreas .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (06) :876-888
[3]   Formative versus reflective measurement models: Two applications of formative measurement [J].
Coltman, Tim ;
Devinney, Timothy M. ;
Midgley, David F. ;
Venaik, Sunil .
JOURNAL OF BUSINESS RESEARCH, 2008, 61 (12) :1250-1262
[4]  
Davies A., 2017, PROJ
[5]  
Davies A, 2017, MIT SLOAN MANAGE REV, V59, P73
[6]   Advancing formative measurement models [J].
Diamantopoulos, Adamantios ;
Riefler, Petra ;
Roth, Katharina P. .
JOURNAL OF BUSINESS RESEARCH, 2008, 61 (12) :1203-1218
[7]  
Engineering News-Record, 2010, TOP 100 CM FOR FEE F
[8]  
Engineering News-Record, 2019, ENR 2019 TOP 50 PROG
[9]  
Flyvbjerg B., 2017, The Oxford handbook of megaproject management, P1, DOI DOI 10.1093/OXFORDHB/9780198732242.001.0001
[10]   A Primer on Partial Least Squares Structural Equation Modeling [J].
Ketchen, David J., Jr. .
LONG RANGE PLANNING, 2013, 46 (1-2) :184-185