共 17 条
[3]
Fleischmann M, 2001, PROD OPER MANAG, V10, P156
[5]
Planning the e-scrap reverse production system under uncertainty in the state of Georgia:: A case study
[J].
IEEE TRANSACTIONS ON ELECTRONICS PACKAGING MANUFACTURING,
2006, 29 (03)
:150-162
[8]
Kouvelis P., 1997, NONCONVEX OPTIMIZATI