Engineering change: a theoretical assessment and a case study

被引:25
作者
Barzizza, R [1 ]
Caridi, M [1 ]
Cigolini, R [1 ]
机构
[1] Politecn Milan, Dipartimento Econ & Prod, I-20133 Milan, Italy
关键词
production planning; engineering change; change management;
D O I
10.1080/09537280010024054
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The competitive playground where nowadays firms struggle to survive has rapidly become unforeseeable: product life cycle has shrunk, becoming even shorter than in the past, and world-wide market is suffering for a strong customer differentiation which led to an increasingly wide product mix. In this industrial environment, the engineering change process is getting more and more attention throughout the branches of industry, as it appears as a critical process which seeps into the operations management core, thus influencing the overall firm's performances. A brief state-of-the-art in the area of engineering change is firstly presented. Then a proposal of classification and a new methodology for an effective engineering change process management are suggested.
引用
收藏
页码:717 / 726
页数:10
相关论文
共 24 条
[1]  
[Anonymous], PROD INVENTORY MANAG
[2]  
BALAKRISHNAN N, 1996, PRODUCTION OPERATION, V4, P335
[3]  
BARZIZZA R, 1998, THESIS POLITECNICO M
[4]   THE EFFECT OF ENGINEERING CHANGES AND DEMAND UNCERTAINTY ON MRP LOT SIZING - A CASE-STUDY [J].
CHALMET, LG ;
DEBODT, M ;
VANWASSENHOVE, L .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1985, 23 (02) :233-251
[5]  
Diprima M., 1982, Prod Invent Manag, V23, P81
[6]  
*EC GROUP, 1995, IBM INT PUBL
[7]  
*EC GROUP, 1994, IBM INT PUBL
[8]  
Garvin D. A., 1991, BOEING 767 CONCEPT P
[9]  
GRANDO A, 1998, PLANT CAPACITY PRODU, V18
[10]  
GRANDO A, 1998, PLANT CAPACITY PRODU, V17