A better project performance prediction model using fuzzy time series and data envelopment analysis

被引:14
作者
Salari, Mostafa [1 ]
Khamooshi, Homayoun [2 ]
机构
[1] Univ Calgary, Calgary, AB, Canada
[2] George Washington Univ, Washington, DC USA
关键词
earned value management; cost and schedule performance index; fuzzy time series; forecasting; performance management; data envelopment analysis; EARNED VALUE MANAGEMENT; FORECASTING ENROLLMENTS; DURATION;
D O I
10.1057/jors.2016.20
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Earned value management (EVM) is a critical project management methodology that evaluates and predicts project performance from cost and schedule perspectives. The novel theoretical framework presented in this paper estimates future performance of a project based on the past performance data. The model benefits from a fuzzy time series forecasting model in the estimation process. Furthermore, fuzzy-based estimation is developed using linguistic terms to interpret different possible conditions of projects. Eventually, data envelopment analysis is applied to determine the superior model for forecasting of project performance. Multiple illustrative cases and simulated data have been used for comparative analysis and to illustrate the applicability of theoreticalmodel to real situations. Contrary to EVM-based approach, which assumes the future performance is the same as the past, the proposed model can greatly assist project managers in more realistically assessing prospective performance of projects and thereby taking necessary and on-time appropriate actions.
引用
收藏
页码:1274 / 1287
页数:14
相关论文
共 48 条
  • [1] Al-Jibouri SaadH., 2003, International journal of project management, V21, P145, DOI DOI 10.1016/S0263-7863(02)00010-8
  • [2] Monitoring project duration and cost in a construction project by applying statistical quality control charts
    Aliverdi, Reza
    Naeni, Leila Moslemi
    Salehipour, Amir
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) : 411 - 423
  • [3] Anbari F.T., 2003, PROJ MANAG J, V34, P12, DOI [10.1109/EMR.2004.25113, DOI 10.1177/875697280303400403, 10.1177/875697280303400403]
  • [4] [Anonymous], 2008, A Guide to the Project Management Body of Knowledge (PMBOK Guide), V4th
  • [5] The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia
    Azman, Mohd Azrai
    Abdul-Samad, Zulkiflee
    Ismail, Suraya
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (07) : 994 - 1005
  • [6] Designing a control mechanism using earned value analysis: an application to production environment
    Bagherpour, Morteza
    Zareei, Abalfazl
    Noori, Siamak
    Heydari, Mehdi
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8) : 419 - 429
  • [7] SOME MODELS FOR ESTIMATING TECHNICAL AND SCALE INEFFICIENCIES IN DATA ENVELOPMENT ANALYSIS
    BANKER, RD
    CHARNES, A
    COOPER, WW
    [J]. MANAGEMENT SCIENCE, 1984, 30 (09) : 1078 - 1092
  • [8] Probabilistic forecasting of project performance using stochastic S curves
    Barraza, GA
    Back, WE
    Mata, F
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 25 - 32
  • [9] Optimizing the Configuration of Development Teams Using EVA: The Case of Ongoing Project Adjustments Facing Personnel Restrictions
    Baumeister, Alexander
    Floren, Alexander
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2011, 2 (01) : 62 - 77
  • [10] A Bayesian Approach to Improve Estimate at Completion in Earned Value Management
    Caron, Franco
    Ruggeri, Fabrizio
    Merli, Alessandro
    [J]. PROJECT MANAGEMENT JOURNAL, 2013, 44 (01) : 3 - 16