Use of numerical groundwater modeling to evaluate uncertainty in conceptual models of recharge and hydrostratigraphy

被引:0
|
作者
Pohlmann, K.
Ye, M.
Pohll, G.
Chapman, J.
机构
来源
2007 IEEE INTERNATIONAL SYMPOSIUM ON TECHNOLOGY AND SOCIETY | 2007年
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The uncertainty associated with multiple conceptual models of groundwater recharge and subsurface hydrostratigraphy and the impacts of this uncertainty on predictions made by a regional groundwater flow model is quantitatively evaluated. The composite prediction formally incorporates the uncertainty in the alternative input models using maximum likelihood Bayesian model averaging. The alternative models are weighted by model probability, which is the degree of belief that a model is more plausible given available prior information and site measurements. Flow predictions are found to be more sensitive to hydrostratigraphy than to recharge. Furthermore, posterior model uncertainty is dominated by inter-model variance as opposed to intra-model variance, indicating that conceptual model uncertainty has greater impact on the results than parametric uncertainty. Without consideration of conceptual model uncertainty, uncertainty in the flow predictions would be significantly underestimated.
引用
收藏
页码:165 / 169
页数:5
相关论文
共 50 条
  • [1] Numerical modeling of natural groundwater recharge
    Hamdi, Y
    Robert, JL
    Therrien, R
    COMPUTATIONAL METHODS IN WATER RESOURCES, VOLS 1 AND 2: COMPUTATIONAL METHODS FOR SUBSURFACE FLOW AND TRANSPORT - COMPUTATIONAL METHODS, SURFACE WATER SYSTEMS AND HYDROLOGY, 2000, : 1101 - 1106
  • [2] Investigations of Impact of Recharge Wells on Groundwater in Buraydah by Numerical Modeling
    Ghazaw, Yousry M.
    Ghumman, Abdul R.
    Al-Salamah, Ibrahim
    Khan, Qaiser U. Z.
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2014, 39 (02) : 713 - 724
  • [3] Investigations of Impact of Recharge Wells on Groundwater in Buraydah by Numerical Modeling
    Yousry M. Ghazaw
    Abdul R. Ghumman
    Ibrahim Al-Salamah
    Qaiser U. Z. Khan
    Arabian Journal for Science and Engineering, 2014, 39 : 713 - 724
  • [4] COMBINED USE OF WATERSHED, AQUIFER AND CROP SIMULATION-MODELS TO EVALUATE GROUNDWATER RECHARGE THROUGH PERCOLATION PONDS
    SELVARAJAN, M
    BHATTACHARYA, AK
    AGRICULTURAL SYSTEMS, 1995, 47 (01) : 1 - 24
  • [5] Numerical groundwater-flow modeling to evaluate potential effects of pumping and recharge: implications for sustainable groundwater management in the Mahanadi delta region, India
    Sahoo, Sasmita
    Jha, Madan K.
    HYDROGEOLOGY JOURNAL, 2017, 25 (08) : 2489 - 2511
  • [6] GROUNDWATER MODELING - NUMERICAL-MODELS
    FAUST, CR
    MERCER, JW
    GROUND WATER, 1980, 18 (04) : 395 - 409
  • [7] Quantifying the uncertainty in future groundwater recharge simulations from regional climate models
    Ajjur, Salah Basem
    Al-Ghamdi, Sami G.
    HYDROLOGICAL PROCESSES, 2022, 36 (08)
  • [8] Exploring conceptual models of infiltration and groundwater recharge on an intermittent river: The role of geologic controls
    Beetle-Moorcroft, Fern
    Shanafield, Margaret
    Singha, Kamini
    JOURNAL OF HYDROLOGY-REGIONAL STUDIES, 2021, 35
  • [9] An integrated conceptual and modeling framework for studying groundwater recharge in and and semi-arid regions
    Prucha, RH
    Illangasekare, T
    COMPUTATIONAL METHODS IN WATER RESOURCES, VOLS 1 AND 2, PROCEEDINGS, 2002, 47 : 1503 - 1509
  • [10] Propagating conceptual and parametric uncertainty from regional to local groundwater models
    Awad, M. A.
    Hassan, A. E.
    Bekhit, H. M.
    GROUNDWATER MODELING AND MANAGEMENT UNDER UNCERTAINTY, 2012, : 33 - 42