An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction

被引:39
|
作者
Chan, Daniel W. M. [2 ]
Chan, Albert P. C. [2 ]
Lam, Patrick T. I. [2 ]
Wong, James M. W. [1 ]
机构
[1] Univ Hong Kong, Dept Civil Engn, Hong Kong, Hong Kong, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
关键词
Guaranteed maximum price; Target cost contracting; Motives; Benefits; Hong Kong;
D O I
10.1016/j.ijproman.2010.04.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In light of increasing project complexity, constraints on programme schedule and limited budget, there exists a strong call for changes in contracting procedures in construction. Both the Guaranteed Maximum Price (GMP) and Target Cost Contracting (TCC) approaches with a gain-share/pain-share arrangement have been advocated to achieve better value for money and more satisfactory project performance. This paper aims to review the prevailing practices of GMP/TCC in general, and explore the motives and benefits of implementing the GMP/TCC scheme in comparison with the traditional fixed-price lump-sum contract in particular. The research study is based on a comprehensive literature review and an industry-wide empirical questionnaire survey for evaluating the relative importance of motives and benefits associated with GMP/TCC in Hong Kong. The survey data collected from 45 valid completed questionnaires were analysed using the mean score ranking technique, Kendall's concordance test, Spearman's rank correlation test and one-way ANOVA test. The perceived benefits were measured and ranked from the perspectives of the client, contractor and consultant for cross-comparison. The survey findings indicated that the three most common motives of clients behind their decision of adopting GMP/TCC include: (1) to generate an incentive for contractor to achieve cost saving; (2) to develop better working relationship within the project team; and (3) to tap in contractor's expertise in design and innovation. The top three perceived benefits of applying GMP/TCC were found to be: (1) early settlement of final project account; (2) improved partners' working relationship under a partnering arrangement; and (3) capability of integrating contractor's expertise in building designs and innovations prior to construction. The research results are particularly essential in assisting key project stakeholders to realise the potential benefits derived from the use of GMP/TCC contracts and in generating more useful insights into alternative integrated contracting strategies for the construction industry, so as to drive for excellence in overall project performance. (C) 2010 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:577 / 590
页数:14
相关论文
共 12 条
  • [1] Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Wong, James M. W.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 495 - 507
  • [2] Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction
    Chan, Joseph
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Yeung, John
    JOURNAL OF FACILITIES MANAGEMENT, 2011, 9 (01) : 34 - +
  • [3] A CRITICAL STUDY OF RISK ALLOCATION IN GUARANTEED MAXIMUM PRICE AND TARGET COST CONTRACTS IN HONG KONG
    Chan, Joseph H. L.
    Chan, Daniel W. M.
    Lam, Patrick T. I.
    PROCEEDINGS OF THE SECOND INTERNATIONAL POSTGRADUATE CONFERENCE ON INFRASTRUCTURE AND ENVIRONMENT, VOL 1, 2010, : 205 - 215
  • [4] Risk mitigation strategies for guaranteed maximum price and target cost contracts in construction A factor analysis approach
    Chan, Joseph
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    JOURNAL OF FACILITIES MANAGEMENT, 2012, 10 (01) : 6 - +
  • [5] Evaluating Guaranteed Maximum Price and Target Cost Contracting Strategies in Hong Kong Construction Industry
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Lam, Edmond
    Wong, James
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2007, 12 (03) : 139 - +
  • [6] A Comparative Study of the Benefits of Applying Target Cost Contracts Between South Australia and Hong Kong
    Chan, Daniel W. M.
    Lam, Patrick T. I.
    Chan, Joseph H. L.
    Ma, Tony
    Perkin, Thomas
    PROJECT MANAGEMENT JOURNAL, 2012, 43 (02) : 4 - 20
  • [7] Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Yeung, John F. Y.
    Chan, Joseph H. L.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (06) : 751 - 763
  • [8] THE RELATIONSHIP BETWEEN MOTIVES AND BENEFITS ON ADOPTING QLASSIC - CIS 7: 2006 IN MALAYSIA CONSTRUCTION INDUSTRY
    Kam, Kenn Jhun
    Hilmy, Ahmad
    Hamid, Abdul
    INTERNATIONAL JOURNAL FOR QUALITY RESEARCH, 2012, 6 (04) : 321 - 331
  • [9] A Research Framework for Exploring Risk Allocation Mechanisms for Target Cost Contracts in Construction
    Chan, Daniel W. M.
    Chan, Albert P. C.
    Lam, Patrick T. I.
    Chan, Joseph H. L.
    Hughes, Will
    Ma, Tony
    PROCEEDINGS OF CRIOCM 2008 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCES OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2008, : 285 - 292
  • [10] Guaranteed maximum price (GMP) contracts in practice A case study of a private office development project in Hong Kong
    Chan, Daniel
    Lam, Patrick
    Chan, Albert
    Wong, James
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2011, 18 (02) : 188 - +