Interval MULTIMOORA Method Integrating Interval Borda Rule and Interval Best-Worst-Method-Based Weighting Model: Case Study on Hybrid Vehicle Engine Selection

被引:76
作者
Hafezalkotob, Arian [1 ,2 ]
Hafezalkotob, Ashkan [2 ]
Liao, Huchang [1 ,3 ,4 ]
Herrera, Francisco [1 ,4 ]
机构
[1] Univ Granada, Andalusian Res Inst Data Sci & Computat Intellige, E-18071 Granada, Spain
[2] Islamic Azad Univ, South Tehran Branch, Coll Ind Engn, Tehran 1151863411, Iran
[3] Sichuan Univ, Business Sch, Chengdu 610064, Peoples R China
[4] King Abdulaziz Univ, Fac Comp & Informat Technol, Jeddah 21589, Saudi Arabia
基金
中国国家自然科学基金;
关键词
Decision making; Entropy; Gold; Engines; Mathematical model; Computational modeling; Cybernetics; Group interval best-worst method (BWM); hybrid vehicle engine selection; interval Borda rule; interval entropy; interval MULTIMOORA; multiple criteria decision making (MCDM); DECISION-MAKING PROBLEMS; VIKOR METHOD; EXTENSION; ENTROPY; TOPSIS;
D O I
10.1109/TCYB.2018.2889730
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we present an interval MULTIMOORA method with complete interval computation in which the interval distances of interval numbers and preference matrix are used. In addition, we propose a group interval best-worst method (BWM) with interval preference degree. The group interval BWM has a hierarchical structure of group decision making with two levels of experts. Beside employing the dominance theory to integrate subordinate rankings, we introduce the interval Borda rule as an aggregation function which does not have the defects of the dominance theory. We calculate the objective interval weights of criteria based on the interval entropy method, which are integrated by the subjective weights computed by the group interval BWM. The approach presented in this paper is verified by a real-world engineering selection problem of a hybrid vehicle engine based on real data and opinions of engineering design experts of the automotive industry of Iran. The preference-based and dominance-based ranking lists are presented for the problem. We solve the same case by employing the interval TOPSIS and VIKOR methods. Eventually, all resultant rankings are compared based on Spearman rank correlation coefficients.
引用
收藏
页码:1157 / 1169
页数:13
相关论文
共 41 条
[1]   ZBWM: The Z-number extension of Best Worst Method and its application for supplier development [J].
Aboutorab, Hamed ;
Saberi, Morteza ;
Asadabadi, Mehdi Rajabi ;
Hussain, Omar ;
Chang, Elizabeth .
EXPERT SYSTEMS WITH APPLICATIONS, 2018, 107 :115-125
[2]  
[Anonymous], 2017, MODERN ELECT HYBRID
[3]  
Awasthi Anjali, 2017, International Journal of Logistics Systems and Management, V27, P261
[4]   Integration of ELECTRE III and PROMETHEE II Decision-Making Methods with an Interval Approach: Application in Selection of Appropriate Structural Systems [J].
Balali, Vahid ;
Zahraie, Banafsheh ;
Roozbahani, Abbas .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) :297-314
[5]  
Benshan Y. J. S., 1992, SYSTEMS ENG THEORY P, V1, P49
[6]   MULTIMOORA FOR THE EU MEMBER STATES UPDATED WITH FUZZY NUMBER THEORY [J].
Brauers, Willem K. M. ;
Balezentis, Alvydas ;
Balezentis, Tomas .
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2011, 17 (02) :259-290
[7]  
Brauers WKM, 2012, INFORMATICA-LITHUAN, V23, P1
[8]   Multimoora Optimization Used to Decide on a Bank Loan to Buy Property [J].
Brauers, Willem Karel M. ;
Zavadskas, Edmundas Kazimieras .
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2011, 17 (01) :174-188
[9]   PROJECT MANAGEMENT BY MULTIMOORA AS AN INSTRUMENT FOR TRANSITION ECONOMIES [J].
Brauers, Willem Karel M. ;
Zavadskas, Edmundas Kazimieras .
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2010, 16 (01) :5-24
[10]   A Historical Account of Types of Fuzzy Sets and Their Relationships [J].
Bustince, Humberto ;
Barrenechea, Edurne ;
Pagola, Miguel ;
Fernandez, Javier ;
Xu, Zeshui ;
Bedregal, Benjamin ;
Montero, Javier ;
Hagras, Hani ;
Herrera, Francisco ;
De Baets, Bernard .
IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2016, 24 (01) :179-194