共 35 条
- [3] Operating experience in la Pereda 1.7 MWth Calcium Looping pilot 13TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-13, 2017, 114 : 149 - 157
- [5] Performance of the carbonator and calciner during long-term carbonate looping tests in a 1 MWth pilot plant JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2020, 8 (01):