Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks

被引:38
|
作者
Meerkov, Semyon M. [1 ]
Zhang, Liang [1 ]
机构
[1] Univ Michigan, Dept Elect Engn & Comp Sci, Ann Arbor, MI 48109 USA
关键词
Production lines; Bernoulli reliability and quality models; Quality-quantity coupling; SERIAL PRODUCTION LINES; SYSTEM;
D O I
10.1007/s10479-009-0526-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Serial production lines with machines having their quality parameters monotonically decreasing as a function of their efficiencies are analyzed. The Bernoulli reliability and quality models are assumed. It is shown that in such systems the production rate of good parts is a non-monotonic function with respect to machine efficiencies. Thus, bottlenecks may be eliminated by either increasing or decreasing machine efficiency, depending on the operating point.
引用
收藏
页码:119 / 131
页数:13
相关论文
共 8 条
  • [1] Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks
    Semyon M. Meerkov
    Liang Zhang
    Annals of Operations Research, 2011, 182 : 119 - 131
  • [2] Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design
    Meerkov, Semyon M.
    Zhang, Liang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (16) : 4745 - 4766
  • [3] Transient behavior of serial production lines with Bernoulli machines
    Meerkov, Semyon M.
    Zhang, Liang
    IIE TRANSACTIONS, 2008, 40 (03) : 297 - 312
  • [4] Operations Sequencing in Flexible Production Lines With Bernoulli Machines
    Zhang, Liang
    Yue, Xiaohang
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (03) : 645 - 653
  • [5] Analysis of closed-loop production lines with Bernoulli reliability machines: Theory and application
    Feng, Yuan
    Zhong, Xiang
    Li, Jingshan
    Fan, Wenhui
    IISE TRANSACTIONS, 2018, 50 (03) : 143 - 160
  • [6] Cellular Production Lines With Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control
    Meerkov, Semyon M.
    Yan, Chao-Bo
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (02) : 764 - 768
  • [7] Dynamic Modeling and Analysis of Bernoulli Production Lines With Small-Lot Orders and Product Quality Problems
    Ma, Chiye
    Jia, Zhiyang
    Zhang, Jianchao
    Duan, Minghao
    Wang, Wei
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2025, 21 (01) : 258 - 266
  • [8] Performance analysis for serial production lines with Bernoulli Machines and Real-time WIP-based Machine switch-on/off control
    Jia, Zhiyang
    Zhang, Liang
    Arinez, Jorge
    Xiao, Guoxian
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (21) : 6285 - 6301