The commissioning plan for the spallation neutron source ring and transport lines

被引:0
|
作者
Henderson, S [1 ]
Assadi, S [1 ]
Cousineau, S [1 ]
Dodson, G [1 ]
Danilov, V [1 ]
Galambos, J [1 ]
Holmes, J [1 ]
Reece, K [1 ]
Shea, T [1 ]
Raparia, D [1 ]
Blaskiewicz, M [1 ]
Lee, YY [1 ]
Papaphilippou, Y [1 ]
机构
[1] Oak Ridge Natl Lab, Oak Ridge, TN 37830 USA
关键词
D O I
暂无
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
The Spallation Neutron Source (SNS) accelerator systems will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. In order to satisfy the accelerator systems' portion of the Critical Decision 4 (CD-4) commissioning goal (which marks the completion of the construction phase of the project), a beam pulse with intensity greater than 1x10(13) protons must be accumulated in the ring, extracted in a single turn and delivered to the target. A commissioning plan has been formulated for bringing into operation and establishing nominal operating conditions for the various ring and transport line subsystems as well as for establishing beam conditions and parameters which meet the commissioning goal.
引用
收藏
页码:1569 / 1571
页数:3
相关论文
共 50 条
  • [21] Magnets for the national spallation neutron source accumulator ring
    Tuozzolo, J
    Brodowski, J
    Danby, G
    Jackson, J
    Meng, W
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 3233 - 3235
  • [22] Results from the commissioning of the n_TOF spallation neutron source at CERN
    Borcea, C
    Cennini, P
    Dahlfors, M
    Ferrari, A
    Garcia-Muñoz, G
    Haefner, P
    Herrera-Martínez, A
    Kadi, Y
    Lacoste, V
    Radermacher, E
    Saldaña, F
    Vlachoudis, V
    Zanini, L
    Rubbia, C
    Buono, S
    Dangendorf, V
    Nolte, R
    Weierganz, M
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2003, 513 (03): : 524 - 537
  • [23] Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector
    Welton, R. F.
    Han, B. X.
    Stockli, M. P.
    Murray, S. N.
    Pennisi, T. R.
    Stinson, C.
    Barnett, W.
    Aleksandrov, A.
    Piller, M.
    Saethre, R.
    Kang, Y.
    Zhukov, A.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2020, 91 (01):
  • [24] Electron-cloud mitigation in the spallation neutron source ring
    Wei, J
    Blaskiewicz, M
    Brodowski, J
    Cameron, P
    Davino, D
    Fedotov, A
    He, P
    Hseuh, H
    Lee, YY
    Ludewig, H
    Meng, W
    Raparia, D
    Tuozzolo, J
    Zhang, SY
    Aleksandrov, A
    Cousineau, S
    Danilov, V
    Henderson, S
    Furman, M
    Pivi, M
    Macek, R
    Catalan-Lasheras, N
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 2598 - 2600
  • [25] Digital rf control for Spallation Neutron Source accumulator ring
    Ma, Hengjie
    Kasemir, K.
    Champion, M.
    Crofford, M.
    Hardek, T.
    Piller, M.
    Zhang, Y.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 1181 - 1183
  • [26] Spallation neutron source ring - Status, challenges, issues, and perspectives
    Wei, J
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 571 - 575
  • [27] 160 kW beam commissioning for the Rapid Cycling Synchrotron of the China Spallation Neutron Source
    Huang, Ming-Yang
    Liu, Hanyang
    Huang, Liangsheng
    Xu, Shouyan
    Lu, Xiaohan
    An, Yuwen
    Peng, Jun
    Li, Zhiping
    Li, Yong
    Chen, Jianliang
    Zhou, Kai
    Han, Yanliang
    Yuan, Yaoshuo
    Yuan, Yue
    Wang, Sheng
    JOURNAL OF INSTRUMENTATION, 2024, 19 (11):
  • [28] Mechanism of electron cloud clearing in the accumulator ring of the Spallation Neutron Source
    Wang, LF
    Raparia, D
    Wei, J
    Zhang, SY
    PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2004, 7 (03): : 38 - 49
  • [29] Design and commissioning of the photon monitors and optical transport lines for the advanced photon source positron accumulator ring
    Berg, W
    Yang, B
    Lumpkin, A
    Jones, J
    BEAM INSTRUMENTATION - PROCEEDINGS OF THE SEVENTH WORKSHOP, 1997, (390): : 483 - 490
  • [30] Experimental characterization of the spallation neutron source accumulator ring collimation system
    SNS, ORNL, Oak Ridge, TN 37830, United States
    Proceedings of the IEEE Particle Accelerator Conference, 2007, : 703 - 705