The commissioning plan for the spallation neutron source ring and transport lines

被引:0
|
作者
Henderson, S [1 ]
Assadi, S [1 ]
Cousineau, S [1 ]
Dodson, G [1 ]
Danilov, V [1 ]
Galambos, J [1 ]
Holmes, J [1 ]
Reece, K [1 ]
Shea, T [1 ]
Raparia, D [1 ]
Blaskiewicz, M [1 ]
Lee, YY [1 ]
Papaphilippou, Y [1 ]
机构
[1] Oak Ridge Natl Lab, Oak Ridge, TN 37830 USA
关键词
D O I
暂无
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
The Spallation Neutron Source (SNS) accelerator systems will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. In order to satisfy the accelerator systems' portion of the Critical Decision 4 (CD-4) commissioning goal (which marks the completion of the construction phase of the project), a beam pulse with intensity greater than 1x10(13) protons must be accumulated in the ring, extracted in a single turn and delivered to the target. A commissioning plan has been formulated for bringing into operation and establishing nominal operating conditions for the various ring and transport line subsystems as well as for establishing beam conditions and parameters which meet the commissioning goal.
引用
收藏
页码:1569 / 1571
页数:3
相关论文
共 50 条
  • [1] Studies performed in preparation for the Spallation Neutron Source accumulator ring commissioning
    Cousineau, S
    Danilov, V
    Henderson, S
    Holmes, J
    Plum, M
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 154 - 156
  • [2] Commissioning of the spallation neutron source accelerator systems
    Plum, M. A.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2471 - 2475
  • [3] Spallation Neutron Source Superconducting linac commissioning algorithms
    Henderson, S
    Campisi, I
    Galambos, J
    Jeon, D
    Zhang, Y
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 237 - 239
  • [4] Commissioning of the spallation neutron source front end systems
    Aleksandrov, A
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 65 - 69
  • [5] Commissioning of cryogenic system for China Spallation Neutron Source
    Ye Bin
    He Chongchao
    Li Na
    Ding Meiying
    Wang Yaqiong
    Zhang Yu
    He Kun
    ADVANCES IN CRYOGENIC ENGINEERING, 2017, 278
  • [6] Commissioning of the superconducting Linac at the spallation neutron source (SNS)
    Kim, Sang-ho
    Campisi, Isidoro E.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2007, 17 (02) : 1299 - 1304
  • [7] Software tools for commissioning of the Spallation Neutron Source Linac
    Galambos, J.
    Aleksandrov, A.
    Allen, C. K.
    Henderson, S.
    Shishlo, A.
    Pelaia, T.
    Zhang, Y.
    Chu, C. P.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2556 - +
  • [8] Commissioning of the 1 MW spallation neutron source SINQ
    Bauer, GS
    Fischer, WE
    Rohrer, U
    Schryber, U
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 3785 - 3787
  • [9] Spallation neutron source ring diagnostics
    Cameron, P
    Brodowski, J
    Cerniglia, P
    Connolly, R
    Cupolo, J
    Dawson, C
    Degen, C
    DellaPenna, A
    Gassner, D
    Gonzalez, R
    Grau, M
    Gullotta, J
    Hoff, L
    Huhn, A
    Kesselman, M
    Liaw, C
    Mead, J
    Sikora, R
    Smith, G
    Vetter, K
    Wilinski, M
    Assadi, S
    Blokland, W
    Diebele, C
    Purcell, D
    Shea, T
    Plum, M
    Witkover, R
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 2444 - 2446
  • [10] Spallation neutron source target station design, development, and commissioning
    Haines, J. R.
    McManamy, T. J.
    Gabriel, T. A.
    Battle, R. E.
    Chipley, K. K.
    Crabtree, J. A.
    Jacobs, L. L.
    Lousteau, D. C.
    Rennich, M. J.
    Riemer, B. W.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2014, 764 : 94 - 115