共 50 条
[23]
Transient Performance Evaluation of Assembly Systems with Bernoulli Machines
[J].
IFAC PAPERSONLINE,
2015, 48 (03)
:88-93
[28]
Finite Production Run-based Performance Evaluation of Assembly Systems with Bernoulli Machines
[J].
12TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON2018),
2018,
:79-85
[30]
SCHEDULING OF MACHINE STARTUP AND SHUTDOWN TO REDUCE ENERGY CONSUMPTION IN BERNOULLI PRODUCTION LINES
[J].
PROCEEDINGS OF THE ASME INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2012,
2012,
:1125-1131