Safety Risk Assessment of Highway Bridge Construction Based on Cloud Entropy Power Method

被引:22
作者
Li, Qingfu [1 ]
Zhou, Jianpeng [1 ]
Feng, Jinghe [2 ]
机构
[1] Zhengzhou Univ, Sch Water Conservancy Engn, Zhengzhou 450001, Peoples R China
[2] Henan Jiaotou Jiaozheng Expressway Co Ltd, Zhengzhou 450016, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 17期
关键词
cloud entropy weight method; highway bridges; cloud model theory; risk assessment; PROJECT;
D O I
10.3390/app12178692
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
(1) In recent years, with China's increasing investment in the transportation industry, the construction of highways and bridges has flourished, bringing great convenience to people's lives. At the same time, there are many uncertain factors in the process of bridge construction, being prone to construction risks. In order to meet the requirements of sustainable development, it is necessary to accurately evaluate the safety risk level of bridge construction. Therefore, it is necessary to establish a new scientific safety risk evaluation system for highway bridge construction. (2) Methods. Based on the relevant standards and specifications, this paper establishes a highway bridge construction safety risk evaluation index system, and then uses the cloud entropy weight method to objectively weight each risk index, using cloud model theory to conduct a risk assessment, and through the cloud model images directly determine the overall risk level of bridge construction, and the level of risk indicators. (3) Results. Applying this method to the construction safety risk assessment of a particular bridge, the overall construction risk level of the bridge is obtained as "level 4", and the risk levels of the four first-level indicators are also all "level 4". (4) Conclusions. The cloud entropy weight method proposed in this paper and the traditional AHP-Extenics method are applied to a bridge construction safety risk evaluation, and the evaluation results obtained are consistent. However, this paper uses the cloud model to improve the entropy weight method in order to calculate the weights, which fully reflects the objectivity of the assignment. The cloud model is used for evaluation, and the risk level of indicators can be determined visually with images.
引用
收藏
页数:23
相关论文
共 43 条
[1]   Risk Assessment in Bridge Construction Projects Using Fault Tree and Event Tree Analysis Methods Based on Fuzzy Logic [J].
Abdollahzadeh, Gholamreza ;
Rastgoo, Sima .
ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART B-MECHANICAL ENGINEERING, 2015, 1 (03)
[2]   IoT- and NDT-Based Bridge Risk Assessment and Identification [J].
Agarwal, Aditya ;
Sharma, Vishal ;
Shukla, Vishakha ;
Yadav, Bikarama Prasad ;
Singh, Rajesh .
ADVANCES IN FIRE AND PROCESS SAFETY, 2018, :301-310
[3]   Sustainable Risk Assessment through the Analysis of Financial Losses from Third-Party Damage in Bridge Construction [J].
Ahn, Sungjin ;
Kim, Taehui ;
Kim, Ji-Myong .
SUSTAINABILITY, 2020, 12 (08)
[4]   Risk assessment of bridges under multiple hazards in operation period [J].
Andric, Jelena M. ;
Lu, Da-Gang .
SAFETY SCIENCE, 2016, 83 :80-92
[5]  
[Anonymous], 2011, AN SAF RISK ASS SYST
[6]  
Chai J.C., 2018, HIGHWAY, V63, P166
[7]   Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis [J].
Cho, Taejun ;
Kim, Tae Soo .
FINITE ELEMENTS IN ANALYSIS AND DESIGN, 2008, 44 (6-7) :383-400
[8]  
Choudhry R. M., 2019, PERSPECTIVES RISK AS, DOI [10.5772/intechopen.83501, DOI 10.5772/INTECHOPEN.83501]
[9]   Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines [J].
Choudhry, Rafiq M. ;
Aslam, Mohammad A. ;
Hinze, Jimmie W. ;
Arain, Faisal M. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (07)
[10]  
Curra J., 2019, P GEO C 2019 SOIL ER, P11