Probabilistic Evaluation of Tunnel Boring Machine Penetration Rate Based on Case Analysis

被引:3
作者
Li, Guangkun [1 ]
Xue, Yiguo [1 ]
Su, Maoxin [1 ]
Qiu, Daohong [1 ]
Wang, Peng [1 ]
Liu, Qiushi [1 ]
Jiang, Xudong [1 ]
机构
[1] Shandong Univ, Res Ctr Geotech & Struct Engn, Jinan 250061, Shandong, Peoples R China
关键词
TBM penetration rate; Probability evaluation; Copula; BPNN; Monte Carlo; PARTICLE SWARM OPTIMIZATION; PERFORMANCE PREDICTION; TBM PERFORMANCE; NEURAL-NETWORK; MODEL; PARAMETERS; STRENGTH; SYSTEMS;
D O I
10.1007/s12205-022-0128-z
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Although geological parameters are known to affect the penetration rate (PR) of a tunnel boring machine (TBM), their relation to the probability of TBM PR has been rarely considered. In this article, a probabilistic evaluation model of TBM PR was proposed. Firstly, the marginal distributions of five geological parameters were confirmed by mathematical statistics. Then Copula theory was used to construct a five-dimensional joint probability distribution of the geological parameters in line with the marginal distributions. Next, the collected geological parameters were utilized to train a three-layer backpropagation neural network (BPNN) model for predicting the TBM PR. Finally, A Copula-BPNN coupled model was built for estimating the probability of TBM PR, and a Weibull distribution function of the predicted TBM PR was obtained through Monte Carlo simulation. Considering the uncertainty, correlation, and multi-factor influence, this paper realized the probabilistic evaluation of TBM PR. Discussion on the parameter uncertainty and independence shows that the variability of the geological parameters is necessary in TBM PR prediction. Quantitative probability estimation of the TBM PR can help with optimizing the driving parameters under different geological conditions to improve construction efficiency.
引用
收藏
页码:4840 / 4850
页数:11
相关论文
共 50 条
  • [41] A new model for predicting the advance rate of a Tunnel Boring Machine (TBM) in hard rock conditions
    Arbabsiar, Mohammad Hossein
    Farsangi, Mohammad Ali Ebrahimi
    Mansouri, Hamid
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2020, 35 (02): : 57 - 74
  • [42] Evaluation of Hard Rock Tunnel Boring Machine (TBM) Performance Using Stochastic Modeling
    Jafarshirzad, Peyman
    Ghasemi, Ebrahim
    Yagiz, Saffet
    Kadkhodaei, Mohammad Hossein
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (06) : 3513 - 3529
  • [43] Evaluation of Hard Rock Tunnel Boring Machine (TBM) Performance Using Stochastic Modeling
    Peyman Jafarshirzad
    Ebrahim Ghasemi
    Saffet Yagiz
    Mohammad Hossein Kadkhodaei
    Geotechnical and Geological Engineering, 2023, 41 : 3513 - 3529
  • [44] Application of Several Fuzzy-Based Techniques for Estimating Tunnel Boring Machine Performance in Metamorphic Rocks
    Samadi, Hanan
    Mahmoodzadeh, Arsalan
    Mohammed, Adil Hussein
    Alenizi, Farhan A.
    Ibrahim, Hawkar Hashim
    Nematollahi, Mojtaba
    Elhag, Ahmed Babeker
    ROCK MECHANICS AND ROCK ENGINEERING, 2024, 57 (02) : 1471 - 1494
  • [45] Intelligent assistant driving method for tunnel boring machine based on big data
    Guo, Dong
    Li, Jinhui
    Jiang, Shui-Hua
    Li, Xu
    Chen, Zuyu
    ACTA GEOTECHNICA, 2022, 17 (04) : 1019 - 1030
  • [46] Predicting tunnel boring machine performance through a new model based on the group method of data handling
    Koopialipoor, Mohammadreza
    Nikouei, Sayed Sepehr
    Marto, Aminaton
    Fahimifar, Ahmad
    Armaghani, Danial Jahed
    Mohamad, Edy Tonnizam
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (05) : 3799 - 3813
  • [47] Performance prediction of tunnel boring machine through developing high accuracy equations: A case study in adverse geological condition
    Samaei, Masoud
    Ranjbarnia, Masoud
    Nourani, Vahid
    Naghadehi, Masoud Zare
    MEASUREMENT, 2020, 152 (152)
  • [48] Dynamic analysis and experimental study of a Tunnel boring Machine testbed under multiple conditions
    Huo, Junzhou
    Zhang, Zhange
    Meng, Zhichao
    Li, Jianbin
    Wu, Hanyang
    Jia, Lianhui
    ENGINEERING FAILURE ANALYSIS, 2021, 127
  • [49] Finite element analysis and fatigue life prediction of tunnel boring machine cutter head
    He, Wenbin
    Jiang, Zhiwen
    Ming, Wuyi
    Jia, Lianhui
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2025,
  • [50] Tree-Based Solution Frameworks for Predicting Tunnel Boring Machine Performance Using Rock Mass and Material Properties
    Armaghani, Danial Jahed
    Liu, Zida
    Khabbaz, Hadi
    Fattahi, Hadi
    Li, Diyuan
    Afrazi, Mohammad
    CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES, 2024, 141 (03): : 2421 - 2451