A robust scheduling of projects with time, cost, and quality considerations

被引:17
|
作者
Salmasnia, Ali [1 ]
Mokhtari, Hadi [1 ]
Abadi, Isa Nakhai Kamal [1 ]
机构
[1] Tarbiat Modares Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 2012年 / 60卷 / 5-8期
关键词
Project scheduling; Time; cost; and quality trade-off; Robust approach; Multi-response; RESOURCE-ALLOCATION PROBLEM; TRADE-OFF PROBLEM; PERT; ALGORITHM; OPTIMIZATION; COMPRESSION; MANAGEMENT; NETWORK; MODEL;
D O I
10.1007/s00170-011-3627-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Quality is one of the main pillars that should be effectively considered in managing of industrial projects. In traditional project scheduling problems, only the time and cost are considered without the quality parameters. In this paper, it is suggested that the quality parameter is embedded into the traditional time-cost trade-off problem to develop a time, cost, and quality trade-off problem (TCQTP) with some practical assumptions. To the best of our knowledge, this problem has not been extensively treated in literature yet. The contributions of this article are in threefold: (1) incorporating a practical assumption to the TCQTP that is a relaxation of deterministic assumption to stochastic ones, which no paper has ever attempted to consider it in TCQTP; (2) relaxing the linearity assumption of time function, cost function, and quality function to a general form; and (3) integrating the TCQTP with a robust solution method to minimize the variation effect on time, cost, and quality. Computational experiments, which were done on benchmark problem, show the applicability and good performance of suggested TCQTP.
引用
收藏
页码:631 / 642
页数:12
相关论文
共 50 条
  • [41] Scheduling of Construction Projects
    Bozejko, Wojciech
    Wodecki, Mieczyslaw
    PROCEEDINGS OF THE 6TH EUROPEAN CONFERENCE ON MANAGEMENT LEADERSHIP AND GOVERNANCE, 2010, : 64 - 72
  • [42] Project crashing using a fuzzy multi-objective model considering time, cost, quality and risk under fast tracking technique: A case study
    Feylizadeh, Mohammad Reza
    Mahmoudi, Amin
    Bagherpour, Morteza
    Li, Deng-Feng
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (03) : 3615 - 3633
  • [43] Optimized crew selection for scheduling of repetitive projects
    Roghabadi, Mohammadjavad Arabpour
    Moselhi, Osama
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (06) : 1517 - 1540
  • [44] Robust optimization models for the discrete time/cost trade-off problem
    Hazir, Oncu
    Erel, Erdal
    Gunalay, Yavuz
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 130 (01) : 87 - 95
  • [45] Cost and time risk factors in construction projects in the Dominican Republic
    Fernandez-Valderrama, Pedro
    Urena-Estrella, Crismal
    Moyano, Juan
    Bienvenido-Huertas, David
    FRONTIERS IN BUILT ENVIRONMENT, 2024, 10
  • [46] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [47] Robust airline crew scheduling with flight flying time variability
    Wen, Xin
    Ma, Hoi-Lam
    Chung, Sai-Ho
    Khan, Waqar Ahmed
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2020, 144
  • [48] Robust scheduling on a single machine to minimize total flow time
    Lu, Chung-Cheng
    Lin, Shih-Wei
    Ying, Kuo-Ching
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1682 - 1691
  • [49] Cost and makespan-aware workflow scheduling in hybrid clouds
    Zhou, Junlong
    Wang, Tian
    Cong, Peijin
    Lu, Pingping
    Wei, Tongquan
    Chen, Mingsong
    JOURNAL OF SYSTEMS ARCHITECTURE, 2019, 100
  • [50] A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects
    Nguyen, Dang-Trinh
    Doan, Dinh-Thien-Vuong
    Tran, Nguyen-Ngoc Cuong
    Tran, Duc-Hoc
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (05) : 843 - 854