共 50 条
- [31] The method of scheduling construction projects increasing the use of resources of the general contractor 13TH INTERNATIONAL CONFERENCE MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES (MBMST 2019), 2019, : 683 - 690
- [33] Reliability-driven scheduling of time/cost-constrained grid workflows FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2016, 55 : 1 - 16
- [36] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207
- [39] The PDBO Algorithm for Discrete Time, Cost and Quality Trade - off in Software Projects with Expressing Quality by Defects INTERNATIONAL CONFERENCE ON COMMUNICATIONS, MANAGEMENT, AND INFORMATION TECHNOLOGY (ICCMIT'2015), 2015, 65 : 930 - 939