Joint optimization of Maintenance Force and Spare Parts Provision for k-out-of-n System in Wartime

被引:0
|
作者
Wang, Qiang [1 ,2 ]
Cheng, Zhonghua [1 ]
Ran, Qiaoran [1 ]
Wang, Yadong [1 ]
机构
[1] Army Engn Univ, Equipment Command & Management Dept, Shijiazhuang, Hebei, Peoples R China
[2] Army Mil Transportat Univ, Tianjin, Peoples R China
基金
中国国家自然科学基金;
关键词
k-out-of-n equipment system; decision-making time; joint optimization; marginal benefit method; REPAIR CAPACITY; INVENTORY;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
To deal with the response delay problem of the spare part provision for equipment in wartime, a maintenance strategy is proposed considering the properties of k-out-of-n system and finite maintenance capacity. A mathematical model for the joint optimization of maintenance decision-making and spare parts provision is developed to maximize the system availability and minimize the maintenance cost simultaneously. The marginal benefit method is adopted to solve the proposed model, and the optimal declaration time of spare parts, as well as the optimal maintenance force configuration scheme is obtained.
引用
收藏
页码:1792 / 1799
页数:8
相关论文
共 50 条
  • [41] ON THE RELIABILITY COMPUTATION OF A K-OUT-OF-N SYSTEM
    SARJE, AK
    MICROELECTRONICS AND RELIABILITY, 1993, 33 (02): : 267 - 269
  • [42] OPTIMIZATION PROBLEMS IN K-OUT-OF-N SYSTEMS.
    Nakagawa, Toshio
    1600, (R-34):
  • [43] Multi-level maintenance and inventory joint optimization for a k-out-of-n hyper-system considering the selection of suppliers with incentive discount policies
    Xia, Tangbin
    Cao, Lei
    Xu, Yuhui
    Zhang, Kaigan
    Chen, Zhen
    Pan, Ershun
    Xi, Lifeng
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 241
  • [44] A Joint Reliability and Imperfect Opportunistic Maintenance Optimization for a Multi-State Weighted k-out-of-n System Considering Economic Dependence and Periodic Inspection
    Atashgar, Karim
    Abdollahzadeh, Hadi
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2017, 33 (08) : 1685 - 1707
  • [45] OPTIMIZING TECHNIQUE FOR A K-OUT-OF-N SYSTEM
    LING, AHK
    SOUZA, AAPD
    MICROELECTRONICS AND RELIABILITY, 1975, 14 (02): : 217 - 222
  • [46] BOUNDS ON RELIABILITY OF A K-OUT-OF-N SYSTEM
    LAI, CD
    MICROELECTRONICS AND RELIABILITY, 1993, 33 (05): : 697 - 703
  • [47] Maintenance analysis of a partial observable K-out-of-N system with load sharing units
    Zhang, Nan
    Tian, Sen
    Li, Le
    Wang, Zhongbin
    Zhang, Jun
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2023, 237 (04) : 703 - 713
  • [48] Reliability optimization of k-out-of-n system with random selection of allocative components
    Ling, Xiaoliang
    Wei, Yinzhao
    Si, Shubin
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 186 : 186 - 193
  • [49] Preventive Maintenance of the k-out-of-n System with Respect to Cost-Type Criterion
    Rykov, Vladimir
    Kochueva, Olga
    Rykov, Yaroslav
    MATHEMATICS, 2021, 9 (21)
  • [50] Optimal inspection and maintenance for a repairable k-out-of-n: G warm standby system
    Wu, Hui
    Li, Yan-Fu
    Berenguer, Christophe
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 193