A parallel multi-period optimal scheduling algorithm in microgrids with energy storage systems using decomposed inter-temporal constraints

被引:24
作者
Kim, Tae Hyun [1 ]
Shin, Hansol [1 ]
Kwag, Kyuhyeong [1 ]
Kim, Wook [1 ]
机构
[1] Pusan Natl Univ, Dept Elect & Comp Engn, Busan, South Korea
关键词
Optimal generation scheduling; Parallel computation; Unit commitment; Generalized Bender's decomposition; Optimality condition decomposition; OPTIMAL POWER-FLOW; UNIT COMMITMENT; MANAGEMENT-SYSTEM; SECURITY; OPTIMIZATION; RELIABILITY; DISPATCH; METHODOLOGY;
D O I
10.1016/j.energy.2020.117669
中图分类号
O414.1 [热力学];
学科分类号
摘要
Because microgrids have relatively high share of renewable energy sources and energy storage systems (ESSs) compared with existing large-scale power systems, the inter-temporal constraints such as the generators' ramp-rates and the state-of-charge of the ESSs have a much greater impact on system operation. Therefore, in this paper, the optimization of the microgrid operation, the commitment of generators and the charging/discharging of ESSs, is formulated as a mixed-integer nonlinear programming (MINLP) problem with inter-temporal constraints. In order to find the optimal solution to the problem effectively, we propose a parallel computation method based on the generalized Bender's decomposition and the optimality condition decomposition. The method has the structure which is suitable for parallel computation and the convergence to the optimal solution is greatly improved compared with conventional sequential optimization methods. The proposed method is applied to the CIGRE medium-voltage microgrid benchmark system and the simulation results show that the proposed method has a potential for facilitating full-scale parallel computation ability and the application to the real-time operation of microgrid system. (C) 2020 The Authors. Published by Elsevier Ltd.
引用
收藏
页数:14
相关论文
共 60 条
[1]   MIP-Based Stochastic Security-Constrained Daily Hydrothermal Generation Scheduling [J].
Aghaei, J. ;
Karami, M. ;
Muttaqi, K. M. ;
Shayanfar, H. A. ;
Ahmadi, A. .
IEEE SYSTEMS JOURNAL, 2015, 9 (02) :615-628
[2]   Exploring the reliability effects on the short term AC security-constrained unit commitment: A stochastic evaluation [J].
Aghaei, Jamshid ;
Nikoobakht, Ahmad ;
Siano, Pierluigi ;
Nayeripour, Majid ;
Heidari, Alireza ;
Mardaneh, Mohammad .
ENERGY, 2016, 114 :1016-1032
[3]   Multi-Area Energy and Reserve Dispatch Under Wind Uncertainty and Equipment Failures [J].
Ahmadi-Khatir, Ali ;
Conejo, Antonio J. ;
Cherkaoui, Rachid .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) :4373-4383
[4]   Multiperiod optimal power flow using benders decomposition [J].
Alguacil, N ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (01) :196-201
[5]   Hydrothermal unit commitment with AC constraints by a new solution method based on benders decomposition [J].
Amjady, Nima ;
Ansari, Mohammad Reza .
ENERGY CONVERSION AND MANAGEMENT, 2013, 65 :57-65
[6]  
[Anonymous], 2015, IEEE T SMART GRID
[7]  
[Anonymous], 2009, POLIT ECON LAT AM
[8]  
[Anonymous], 2006, 2006 IEEE POW ENG SO, DOI DOI 10.1109/PES.2006.1709447
[9]   Semi-definite programming-based method for security-constrained unit commitment with operational and optimal power flow constraints [J].
Bai, X. ;
Wei, H. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2009, 3 (02) :182-197
[10]   A decomposition method for network-constrained unit commitment with AC power flow constraints [J].
Bai, Yang ;
Zhong, Haiwang ;
Xia, Qing ;
Kang, Chongqing ;
Xie, Le .
ENERGY, 2015, 88 :595-603