共 50 条
- [24] Minimizing the makespan for different volume parallel batch-processing machines problem with release times and job sizes ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1509 - 1514
- [27] A Simulated Annealing Approach for the Non-Identical Parallel Batch Processing Machines to Minimize Total Weighted Tardiness 11TH NATIONAL CONFERENCE ON MATHEMATICAL TECHNIQUES AND APPLICATIONS, 2019, 2112
- [28] Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness Computers and Industrial Engineering, 1998, 34 (04): : 793 - 806