Optimal scheduling of distributed energy resources as a virtual power plant in a transactive energy framework

被引:116
|
作者
Qiu, Jing [1 ]
Meng, Ke [2 ]
Zheng, Yu [3 ]
Dong, Zhao Yang [4 ]
机构
[1] CSIRO, Energy Flagship, Mayfield West, NSW 2304, Australia
[2] Univ Sydney, Sch Elect & Informat Engn, Sydney, NSW 2006, Australia
[3] Univ Hong Kong, Dept Elect & Elect Engn, Pokfulam Rd, Hong Kong 999077, Hong Kong, Peoples R China
[4] Univ New South Wales, Sch Elect Engn & Telecommun, Sydney, NSW 2052, Australia
基金
中国国家自然科学基金;
关键词
power plants; power generation scheduling; energy resources; power generation economics; power markets; profitability; particle swarm optimisation; decision making; virtual power plant; transactive energy framework; distributed energy resources; integral management scheme; power delivery; wholesale markets; retail markets; two-stage optimal scheduling model; day-ahead markets; DA markets; real-time markets; RT markets; conditional-value-at-risk; VPP; profit variability; enhanced particle swarm optimisation algorithm; two-stage models; commercial solver; decision-making tool; BIDDING STRATEGY; OPTIMAL DISPATCH; DEMAND RESPONSE; MARKETS; OPTIMIZATION; INTEGRATION; SYSTEMS; MODEL; POOL;
D O I
10.1049/iet-gtd.2017.0268
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A transactive energy framework can provide an integral management scheme that facilitates power delivery with high efficiency and reliability. To close the gap between wholesale and retail markets, this study presents a two-stage optimal scheduling model for distributed energy resources in the form of a virtual power plant (VPP) participating in the day-ahead (DA) and real-time (RT) markets. In the first stage, the hourly scheduling strategy of the VPP is optimised, in order to maximise the total profit in the DA market. In the second stage, the outputs of the VPP are optimally adjusted, in order to minimise the imbalance cost in the RT market. The conditional-value-at-risk is used to assess the risk of profit variability due to the presence of uncertainties. Furthermore, formulated two-stage models are solved by the enhanced particle swarm optimisation algorithm and a commercial solver. Case study results show that the proposed approach can identify optimal and accurate scheduling results, and is a useful decision-making tool.
引用
收藏
页码:3417 / 3427
页数:11
相关论文
共 50 条
  • [31] Day-ahead scheduling of virtual power plant in joint energy and regulation reserve markets under uncertainties
    Shayegan-Rad, Ali
    Badri, Ali
    Zangeneh, Ali
    ENERGY, 2017, 121 : 114 - 125
  • [32] Optimal day-ahead scheduling of renewable energy-based virtual power plant considering electrical, thermal and cooling energy
    Basu, Mousumi
    JOURNAL OF ENERGY STORAGE, 2023, 65
  • [33] Agent-Based Integration of Complex and Heterogeneous Distributed Energy Resources in Virtual Power Plants
    Clausen, Anders
    Umair, Aisha
    Demazeau, Yves
    Jorgensen, Bo Norregaard
    ADVANCES IN PRACTICAL APPLICATIONS OF CYBER-PHYSICAL MULTI-AGENT SYSTEMS: THE PAAMS COLLECTION, PAAMS 2017, 2017, 10349 : 43 - 55
  • [34] Two-stage approach for optimal dispatch of distributed energy resources in distribution networks considering virtual power plant concept
    Peik-herfeh, Malahat
    Seifi, Hossein
    Sheikh-El-Eslami, M. Kazem
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2014, 24 (01): : 43 - 63
  • [35] A review on virtual power plant for energy management
    Rouzbahani, Hossein Mohammadi
    Karimipour, Hadis
    Lei, Lei
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2021, 47
  • [36] Operation of a Technical Virtual Power Plant Considering Diverse Distributed Energy Resources
    Gough, Matthew
    Santos, Sergio F.
    Lotfi, Mohamed
    Javadi, Mohammad Sadegh
    Osorio, Gerardo J.
    Ashraf, Paul
    Castro, Rui
    Catalao, Joao P. S.
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2022, 58 (02) : 2547 - 2558
  • [37] Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules
    Cardoso, G.
    Stadler, M.
    Bozchalui, M. C.
    Sharma, R.
    Marnay, C.
    Barbosa-Povoa, A.
    Ferrao, R.
    ENERGY, 2014, 64 : 17 - 30
  • [38] Method for the operation planning of virtual power plants considering forecasting errors of distributed energy resources
    Sowa, Torsten
    Vasconcelos, Maria
    Schnettler, Armin
    Metzger, Michael
    Hammer, Alexander
    Reischboek, Markus
    Koeberle, Robert
    ELECTRICAL ENGINEERING, 2016, 98 (04) : 347 - 354
  • [39] Optimal scheduling of distributed energy resources in smart grids: A complementarity approach
    Aghajani, Saemeh
    Kalantar, Mohsen
    ENERGY, 2017, 141 : 2135 - 2144
  • [40] Optimal power flow management for distributed energy resources with batteries
    Tazvinga, Henerica
    Zhu, Bing
    Xia, Xiaohua
    ENERGY CONVERSION AND MANAGEMENT, 2015, 102 : 104 - 110