Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times

被引:20
作者
Cheng, Hui-Miao [2 ]
Ying, Kuo-Ching [1 ]
机构
[1] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei, Taiwan
[2] China Univ Technol, Dept Informat Management, Taipei, Taiwan
关键词
Scheduling; Flow-line manufacturing cell; Sequence dependent family setups; GROUP SCHEDULING PROBLEMS; SINGLE-MACHINE; COVERING PROBLEMS; PERMUTATION; HEURISTICS; TARDINESS; ALGORITHM; SHOPS;
D O I
10.1016/j.eswa.2011.06.008
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The flow-line manufacturing cell scheduling problem (FMCSP) with sequence dependent family setup times (SDFSTs) is a topic of great concern for many industrial applications, but under-represented in the research literature. In this study, a two-level iterated greedy (TLIG) heuristic is proposed to minimize makespan of this strongly NP-hard problem. The performance of the proposed TLIG heuristic is compared against eight existing algorithms on a benchmark problem set used in earlier studies. The experimental results reveal that the proposed TLIG heuristic is very effective and efficient at finding near-optimal solutions for FMCSPs with SDFSTs. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:15517 / 15522
页数:6
相关论文
共 27 条
[1]  
Campbell HerbertG., 1970, Management Science, V16, P630, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[2]   Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups [J].
França, PM ;
Gupta, JND ;
Mendes, AS ;
Moscato, P ;
Veltink, KJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (03) :491-506
[3]   An evaluation of group scheduling heuristics in a flow-line manufacturing cell [J].
Frazier, GV .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (04) :959-976
[4]   Minimizing flow time in a flow-line manufacturing cell with family setup times [J].
Gupta, JND ;
Schaller, JE .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (02) :163-176
[5]   Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times [J].
Hendizadeh, S. Hamed ;
Faramarzi, Hamidreza ;
Mansouri, S. Afshin ;
Gupta, Jatinder N. D. ;
ElMekkawy, Tarek Y. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :593-605
[6]  
JACOBS LW, 1995, NAV RES LOG, V42, P1129, DOI 10.1002/1520-6750(199510)42:7<1129::AID-NAV3220420711>3.0.CO
[7]  
2-M
[8]   A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date [J].
Lin, Shih-Wei ;
Chou, Shuo-Yan ;
Ying, Kuo-Ching .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (02) :1294-1301
[9]   Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times [J].
Lin, Shih-Wei ;
Gupta, Jatinder N. D. ;
Ying, Kuo-Ching ;
Lee, Zne-Jung .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (12) :3205-3217
[10]   Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times [J].
Lin, Shih-Wei ;
Ying, Kuo-Ching ;
Lee, Zne-Jung .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (04) :1110-1121