共 10 条
[1]
[Anonymous], P ICOOMS 92
[2]
IWATA K, 1994, ANN CIRP, V43, P379
[3]
MORIWAKI T, 1992, P ICOOMS 92, P207
[4]
OKINO N, P ICOOMS 92, P297
[5]
Integrated process planning and scheduling in holonic manufacturing systems
[J].
PROCEEDINGS OF THE 2001 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2001): ASSEMBLY AND DISASSEMBLY IN THE TWENTY-FIRST CENTURY,
2001,
:250-255
[6]
SUGIMURA N, 1999, MANUFACTURING SYSTEM, V29, P155
[7]
SUGIMURA N, 1996, MANUFACTURING SYSTEM, V25, P1
[8]
WARNECKE HJ, 1993, FRACTAL ENTERPRISE
[9]
WIENDAHL HP, 1994, ANN CIRP, V43, P389
[10]
WYNS J, 1996, P 28 CIRP INT SEM MA, P220