MSW contingency planning - Opportunities for perham facility expansion

被引:0
作者
Traeger, David [1 ]
Clark, Matt [1 ]
Louiseau, Robert [1 ]
机构
[1] HDR Engn Inc, Omaha, NE 68114 USA
来源
NAWTEC 15: PROCEEDINGS OF THE 15TH ANNUAL NORTH AMERICAN WASTE TO ENERGY CONFERENCE | 2007年
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The Perham Resource Recovery Facility (PRRF) in Perham, Minnesota receives and processes Municipal Solid Waste (MSW) from Otter Tail, Todd, Wadena and Steams Counties. Combustion of the MSW provides the generation of steam for sale to two local industries. Under the terms of these steam sales agreements, the PRRF supplies the base load and peak steam required by these industries from a MSW boiler and/or a natural gas-fired auxiliary boiler. The City of Fergus Falls, Minnesota until recently operated the Fergus Falls Waste-to-Energy (WTE) plant. This facility received municipal solid waste (MSW) from Otter Tail and Grant County. The facility generated steam for use in the State Hospital, however, the State of Minnesota has decided to shut down the hospital and will no longer need the steam. As a result, on February 28, 2006, the Fergus Falls plant shut down. HDR Engineering, Inc. (HDR) working with the City of Perham and the participating counties, conducted a study to consider cooperative disposal of the waste currently processed in Fergus Falls. Three of the options considered included expansion of the PRRF. These options included salvaging of portions of the Fergus Falls WTE plant and providing pre-combustion processing of the waste to recover recyclables in order to maximize the Perham plant capacity. This paper describes the options and the conclusions of the investigations.
引用
收藏
页码:107 / 112
页数:6
相关论文
empty
未找到相关数据