A semi-automatic processing and visualisation tool for ground-penetrating radar pavement thickness data

被引:33
|
作者
Varela-Gonzalez, Maria [1 ]
Solla, Mercedes [2 ]
Martinez-Sanchez, Joaquin [1 ]
Arias, Pedro [1 ]
机构
[1] Univ Vigo, Sch Min Engn, Dept Nat Resources & Environm Engn, Vigo 36310, Spain
[2] Spanish Naval Acad, Def Univ Ctr, Marin 36920, Spain
关键词
Ground-penetrating radar; Pavement; Civil engineering; Processing; Visualisation; GPR;
D O I
10.1016/j.autcon.2014.05.004
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Ground-penetrating radar (GPR) is a recommendable and cost-effective non-destructive technique for measuring the thickness of pavement layers because data acquisition can take place at normal traffic speeds. On the other hand, the large amount of data collected is difficult to process. Given that processing is conducted by qualified practitioners, it is a key to obtain software tools that allow for accurate thickness measurements and fast processing times. This paper presents a new semi-automatic program for the processing and visualisation of GPR data to measure pavement thicknesses. The results showed that an optimisation in the execution time allowed for a near-immediate response in data processing even when dealing with large data sets. Different data set lengths, ranging from 100 m to 20 km, were analysed, and the processing times required to complete the entire process were examined taking into account three different hardware configurations (i3, i5 and i7 processors). In all cases, the processing times did not exceed 30 s. An additional test was performed to evaluate the reproducibility of the algorithm on a well-defined and preconditioned concrete asphalt course. Furthermore, the visualisation application allows for the georeferencing of the field GPR data by using additional GPS data. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:42 / 49
页数:8
相关论文
共 50 条
  • [1] Accuracy of Ground-Penetrating Radar for Concrete Pavement Thickness Measurement
    Morcous, George
    Erdogmus, Ece
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2010, 24 (06) : 610 - 621
  • [2] Automatic asphalt layer interface detection and thickness determination from ground-penetrating radar data
    Wang, Siqi
    Leng, Zhen
    Zhang, Zeyu
    Sui, Xin
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 357
  • [3] Automatic detection of hyperbolic signatures in ground-penetrating radar data
    Al-Nuaimy, W
    Huang, Y
    Eriksen, A
    Nguyen, VT
    SUBSURFACE AND SURFACE SENSING TECHNOLOGIES AND APPLICATIONS III, 2001, 4491 : 327 - 335
  • [4] Remigration of ground-penetrating radar data
    Jaya, MS
    Botelho, MA
    Hubral, P
    Liebhardt, G
    JOURNAL OF APPLIED GEOPHYSICS, 1999, 41 (01) : 19 - 30
  • [5] Clogging evaluation of porous asphalt pavement using ground-penetrating radar
    Sui, Xin
    Wang, Siqi
    Leng, Zhen
    Yang, Bin
    Lu, Guoyang
    MEASUREMENT, 2023, 216
  • [6] Work Flow of Signal Processing Data of Ground Penetrating Radar Case of Rigid Pavement measurements
    Handayani, Gunawan
    5TH ASIAN PHYSICS SYMPOSIUM (APS 2012), 2015, 1656
  • [7] Pavement-distress detection using ground-penetrating radar and network in networks
    Tong, Zheng
    Yuan, Dongdong
    Gao, Jie
    Wei, Yongfeng
    Dou, Hui
    CONSTRUCTION AND BUILDING MATERIALS, 2020, 233 (233)
  • [8] Algorithm development for the application of ground-penetrating radar on asphalt pavement compaction monitoring
    Shangguan, Pengcheng
    Al-Qadi, Imad
    Coenen, Aaron
    Zhao, Shan
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2016, 17 (03) : 189 - 200
  • [9] Modeling of crosshole ground-penetrating radar data
    Balkaya, Caglayan
    Gokturkler, Gokhan
    PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2016, 22 (06): : 581 - 596
  • [10] Automatic detection of mud-wall signatures in ground-penetrating radar data
    Bordon, Pablo
    Martinelli, Patricia
    Zabala Medina, Peter
    Bonomo, Nestor
    Ratto, Norma Rosa
    ARCHAEOLOGICAL PROSPECTION, 2021, 28 (01) : 89 - 106