Profitability of a multi-model manufacturing line versus multiple dedicated lines

被引:8
作者
Dolgui, Alexandre [1 ]
Hashemi-Petroodi, S. Ehsan [1 ]
Kovalev, Sergey [2 ]
Kovalyov, Mikhail Y. [3 ]
机构
[1] IMT Atlantique, LS2N, CNRS, 4 Rue Alfred Kastler, F-44307 Nantes 3, France
[2] INSEEC Univ Res Ctr, INSEEC Grande Ecole, 25 Rue Univ, F-69007 Lyon, France
[3] Natl Acad Sci Belarus, United Inst Informat Problems, Surganova 6, Minsk 220012, BELARUS
关键词
Multi-product manufacturing system; Reconfigurable manufacturing system; Flexible manufacturing system; Dedicated manufacturing lines; Configuration selection; Heuristics; DESIGN; TIMES;
D O I
10.1016/j.ijpe.2021.108113
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a problem to decide which of the two manufacturing configurations - multiple dedicated lines or a single multi-model manufacturing line - is economically more preferable for manufacturing products of several types in a given time period. The goal of employing any of the two configurations is to maximize the total profit, subject to the product demand and manufacturing time constraints. The selection problem is reduced to two optimization problems, for one of which a polynomial time algorithm is developed, and NP-hardness is demonstrated for the other. A dynamic programming algorithm, a constructive greedy heuristic, a randomized heuristic and a local search algorithm with steepest ascent hill climbing are presented for the NP-hard problem. Computer experiments with the heuristics, local search algorithm and a commercial solver of the corresponding integer linear programming problem are described, which demonstrated appropriate quality of the heuristic and local search solutions. The proposed methodology and software can be used to evaluate different input data scenarios while making a selection decision between the two manufacturing configurations. The product demand and selling prices, setup and manufacturing times, demand and production cancellations are the parameters that affect the selection decision.
引用
收藏
页数:11
相关论文
共 37 条
[11]  
Cormen T. H., 2001, The Knuth-Morris-Pratt Algorithm, V2nd
[12]  
Diaz Andrea, 2020, Developments and Advances in Defense and Security. Proceedings of MICRADS 2020. Smart Innovation, Systems and Technologies (SIST 181), P251, DOI 10.1007/978-981-15-4875-8_22
[13]  
Dolgui A, 2010, SUPPLY CHAIN ENGINEERING: USEFUL METHODS AND TECHNIQUES, P1, DOI 10.1007/978-1-84996-017-5
[14]   Modeling and long-term forecasting demand in spare parts logistics businesses [J].
Dombi, Jozsef ;
Jonas, Tamas ;
Toth, Zsuzsanna Eszter .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 201 :1-17
[15]  
Dorf R.C., 1994, HDB DESIGN MANUFACTU
[16]   Graph theory-based approach to optimize single-product flow-line configurations of RMS [J].
Dou, Jianping ;
Dai, Xianzhong ;
Meng, Zhengda .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (9-10) :916-931
[17]  
Edelkamp S, 2012, HEURISTIC SEARCH: THEORY AND APPLICATIONS, P1
[18]  
ElMaraghy H., 2012, Enabling manufacturing competitiveness and economic sustainability, P2, DOI DOI 10.1007/978-3-642-23860-4_1
[19]   On the technical (in)efficiency of a profit maximum [J].
Fandel, Guenter ;
Lorth, Michael .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 121 (02) :409-426
[20]   A tool to predict physical workload and task times from workstation layout design data [J].
Greig, Michael A. ;
Village, Judy ;
Salustri, Filippo A. ;
Zolfaghari, Saeed ;
Neumann, W. Patrick .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) :5306-5323