A new technology implementation via mathematical modeling for the sequence-dependent setup times of industrial problems

被引:2
|
作者
de Freitas, Miguel Gonsalves [2 ]
Fuchigami, Helio Yochihiro [1 ]
机构
[1] Fed Univ Sao Carlos UFSCar, Prod Engn Dept, Sao Carlos, SP, Brazil
[2] Fed Univ Goias UFG, Fac Sci & Technol FCT, Aparecida De Goiania, GO, Brazil
关键词
Sequence-dependent setup; Traveling salesman problem; Scheduling; Single-machine problem; Mixed-integer linear programming; MACHINE SCHEDULING PROBLEM; SINGLE-MACHINE; RELEASE DATES; ALGORITHM; MINIMIZE;
D O I
10.1016/j.cie.2022.108624
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Scheduling problems with sequence-dependent setup times in industries currently attract the attention of re-searchers and practitioners. This study aims to develop a mathematical model for optimizing a single-machine environment with such times using an analogy with the traveling salesman problem. Employing a technolog-ical and modern modeling language for its computational implementations, firstly, five main formulations of this problem in the literature are evaluated and the best one for addressing the proposed problem is identified. Secondly, an arc-flow completion time and precedence model for a single-machine scheduling problem is assessed. Finally, the proposed model is improved by passing the initial solutions obtained by two heuristics to it. As a result, the mathematical model developed returns lower computational times than state-of-the-art ones (even without improvements to the initial solution) which indicates the success of using an analogy between formulations of the traveling salesman problem and the proposed model.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Job Block Scheduling with Dual Criteria and Sequence-Dependent Setup Time Involving Transportation Times
    Gupta, Deepak
    Nailwal, Kewal Krishan
    Sharma, Sameer
    COMPUTATIONAL INTELLIGENCE, CYBER SECURITY AND COMPUTATIONAL MODELS, 2014, 246 : 321 - 329
  • [42] A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times
    Nagano, Marcelo Seido
    Miyata, Hugo Hissashi
    Araujo, Daniella Castro
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 224 - 230
  • [43] Minimizing makespan in mixed no-wait flowshops with sequence-dependent setup times
    Cheng, Chen-Yang
    Ying, Kuo-Ching
    Li, Shu-Fen
    Hsieh, Ya-Chu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 130 : 338 - 347
  • [44] Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times
    Kim, Jun
    Kim, Hyun-Jung
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (18) : 5438 - 5453
  • [45] Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
    Yong, Liao
    Zhantao, Li
    Xiang, Li
    Chenfeng, Peng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [46] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints
    Kuo, Yiyo
    Chen, Sheng-, I
    Yeh, Yen-Hung
    OPERATIONAL RESEARCH, 2020, 20 (02) : 927 - 942
  • [47] A high performing metaheuristic for job shop scheduling with sequence-dependent setup times
    Naderi, B.
    Ghomi, S. M. T. Fatemi
    Aminnayeri, M.
    APPLIED SOFT COMPUTING, 2010, 10 (03) : 703 - 710
  • [48] An Improved Firefly Algorithm for the Unrelated Parallel Machines Scheduling Problem With Sequence-Dependent Setup Times
    Ezugwu, Absalom E.
    Akutsah, Francis
    IEEE ACCESS, 2018, 6 : 54459 - 54478
  • [49] Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic
    Ying, Kuo-Ching
    Lin, Shih-Wei
    Huang, Chien-Yi
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) : 7087 - 7092
  • [50] Mathematical Modeling and Discrete Firefly Algorithm to Optimize Scheduling Problem with Release Date, Sequence-Dependent Setup Time, and Periodic Maintenance
    Qamhan, Mustafa A.
    Qamhan, Ammar A.
    Al-Harkan, Ibrahim M.
    Alotaibi, Yousef A.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019