Construction Controls for a Half-Through Tied Arch Bridge in China

被引:2
|
作者
Tang, Chunyan [1 ]
Zheng, Li [2 ]
Zhang, Zhe [1 ]
机构
[1] Dalian Univ Technol, Bridge Engn Res Inst, Dalian, Peoples R China
[2] Dalian Univ Technol, Modern Engn Test Co Ltd, Dalian, Peoples R China
关键词
composite beam; erection elevation; installation gaps; suspender force; temperature effect;
D O I
10.2749/101686614X13854694314766
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Based on the half-through tied arch bridge, Deng-jia-yao Bridge in Beijing, a three-dimensional finite element model (FEM) including construction stages is established. The measured values are in good agreement with the finite element results of the final suspender force and bridge elevation. This article summarizes two technical difficulties: the erection elevation of the transverse beams and the effect of temperature on the suspender tension force during construction. The focus is on the precise installation gaps between transverse beams and steel pads. The results show that the reactions of the temporary steel pipe piles are sensitive to the installation gaps. Analysis of the suspender force during the first tensioning of suspenders indicates that the final suspender force cannot be reached if the effect of temperature on the suspender force is ignored.
引用
收藏
页码:557 / 561
页数:5
相关论文
共 50 条
  • [11] Influence of transverse brace arrangement on dynamic characteristics of a half-through CFST arch bridge
    Yun, Di
    Zhang, Su-Mei
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2003, 35 (SUPPL.): : 259 - 262
  • [12] Design of Half-Through Cable-Arch Bridge with 700 m Main Span
    Xie, Xiaoli
    Fu, Yuanjie
    Deng, Nianchun
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2019, 54 (06): : 1162 - 1168
  • [13] Seismic Fragility Analysis of Half-through Concrete Filled Steel Tubular Arch Bridge
    Zhuo W.
    Yan Q.
    Wu M.
    Gu Y.
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (05): : 126 - 132
  • [14] Dynamic analysis of a half-through concrete-filled steel tubular arch bridge
    Zong, ZH
    Jaishi, B
    Ge, JP
    Ren, WX
    ENGINEERING STRUCTURES, 2005, 27 (01) : 3 - 15
  • [15] Tension Identification of Suspenders with Supplemental Dampers for Through and Half-Through Arch Bridges under Construction
    Shan, Deshan
    Chai, Y. H.
    Zhou, Xiaohang
    Khan, Inamullah
    JOURNAL OF STRUCTURAL ENGINEERING, 2019, 145 (03)
  • [16] Application of CFRP Suspenders for Through and Half-through Arch Bridges
    Gao, Jing
    Zhao, Bin
    PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND ENVIRONMENTAL ENGINEERING, 2016, 53 : 316 - 322
  • [17] Application of CFRP Suspenders for Through and Half-through Arch Bridges
    Gao, Jing
    Zhao, Bin
    PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND ENVIRONMENTAL ENGINEERING, 2016, 53 : 336 - 342
  • [18] Dynamic and Impact Behavior of Half-Through Arch Bridges
    Huang, Dongzhou
    JOURNAL OF BRIDGE ENGINEERING, 2005, 10 (02) : 133 - 141
  • [19] Analysis of traveling wave effect on half-through CFST arch bridge by large mass method
    Ma, J. (amajunlxd@163.com), 1600, Trans Tech Publications Ltd (540):
  • [20] A Robust Design of Suspenders in Through and Half-Through Arch Bridges
    Jiang, Ruijuan
    Wu, Qiming
    Chen, Yiyan
    Cui, Fei
    Yi, Xiaowei
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2094 - 2100