An optimization model for line planning and timetabling in automated urban metro subway networks. A case study

被引:38
作者
Blanco, Victor [1 ]
Conde, Eduardo [2 ]
Hinojosa, Yolanda [3 ]
Puerto, Justo [2 ]
机构
[1] Univ Granada, IEMath GR, Granada, Spain
[2] Univ Seville, Dept Stat & OR, Seville, Spain
[3] Univ Seville, Dept Appl Econ 1, Seville, Spain
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2020年 / 92卷
关键词
Line planning; Short-turns; Timetabling; Mixed integer linear programming; Matheuristic; ALGORITHM; VEHICLE; DEMAND; DESIGN; TRAINS;
D O I
10.1016/j.omega.2019.102165
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we present a Mixed Integer Linear Programming model that we developed as part of a pilot study requested by the R&D company METROLAB (R) in order to design tools for finding solutions for line planning and timetable situations in automated urban metro subway networks. Our model incorporates important factors in public transportation systems from both, a cost-oriented and a passenger-oriented perspective, as time-dependent demands, interchange stations, short-turns and technical features of the trains in use. The incoming flows of passengers are modeled by means of piecewise linear demand functions which are parameterized in terms of arrival rates and bulk arrivals. Decisions about frequencies, train capacities, short-turning and timetables for a given planning horizon are jointly integrated to be optimized in our model. Finally, a novel matheuristic approach is proposed to solve the problem. The results of extensive computational experiments are reported to show its applicability and effectiveness to handle real-world subway networks. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页数:18
相关论文
共 41 条
[1]  
[Anonymous], TRANSP SCI
[2]  
[Anonymous], OMEGA
[3]  
[Anonymous], ANN OPER RES
[4]   Exact formulations and algorithm for the train timetabling problem with dynamic demand [J].
Barrena, Eva ;
Canca, David ;
Coelho, Leandro C. ;
Laporte, Gilbert .
COMPUTERS & OPERATIONS RESEARCH, 2014, 44 :66-74
[5]  
Bertsekas D. P., 1999, Nonlinear Programming
[6]   Expanding the Spanish high-speed railway network [J].
Blanco, Victor ;
Puerto, Justo ;
Ramos, Ana B. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2011, 39 (02) :138-150
[7]   An overview on vehicle scheduling models [J].
Bunte S. ;
Kliewer N. .
Public Transp., 2009, 4 (299-317) :299-317
[8]   Approaches to a real-world Train Timetabling Problem in a railway node [J].
Cacchiani, Valentina ;
Furini, Fabio ;
Kidd, Martin Philip .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 58 :97-110
[9]   Confrontation of Different Objectives in the determination of train scheduling [J].
Canca, David ;
Zarzo, Alejandro ;
Algaba, Encarnacion ;
Barrena, Eva .
STATE OF THE ART IN THE EUROPEAN QUANTITATIVE ORIENTED TRANSPORTATION AND LOGISTICS RESEARCH, 2011: 14TH EURO WORKING GROUP ON TRANSPORTATION & 26TH MINI EURO CONFERENCE & 1ST EUROPEAN SCIENTIFIC CONFERENCE ON AIR TRANSPORT, 2011, 20
[10]   A Lagrangian heuristic algorithm for a real-world train timetabling problem [J].
Caprara, A ;
Monaci, M ;
Toth, P ;
Guida, PL .
DISCRETE APPLIED MATHEMATICS, 2006, 154 (05) :738-753