Probabilistic modeling of inspection results for offshore structures

被引:72
作者
Rouhan, A
Schoefs, F
机构
[1] Lab Genie Civil Nantes St Nazaire, F-44322 Nantes 3, France
[2] Res Dept, Bur Veritas, Marine Div, F-92400 Courbevoie, France
关键词
existing structures; probability of detection; false alarm; cost analysis; IM R plans; in-service inspections; risk based inspections; non destructive testing;
D O I
10.1016/S0167-4730(03)00016-X
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Operators of marine structures have to ensure that structural integrity is maintained at a sufficient level during in-service life or in the case of the structure life prolongation. This can be achieved by Inspection, Maintenance and Repair plans (IMR), as rational aid-tools for decisional purposes. Such plans are complex and can be expensive. This leads to their global optimization, particularly regarding inspections. In this context. original results on inspections data in IMR plans are presented. The approach is based on decision and detection theories and include both the probability of false alarm and the probability of detection. It is shown how to introduce these probabilities in a decision scheme. The effect of false alarms and miss detections on the global cost of inspection planning is underlined through a basic example. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:379 / 399
页数:21
相关论文
共 27 条
  • [1] ARQUES PY, 1982, DECISIONS TRAITEMENT
  • [2] BARNOUIN B, 1993, P 12 OMAE B, V3, P883
  • [3] Berens A.P., 1989, ASM Handbook, V17, P689
  • [4] CHARABIT M, 1990, ELEMENTS THEORIE SIG
  • [5] CIOCLOV DD, 1986, SERIE MECANIQUE APPL, V6, P613
  • [6] DOVER WD, 1995, FATIGUE CRACK GROWTH
  • [7] FABER M, 1999, APPL STAT PROBABILIT, P739
  • [8] Fucsok F., 2000, P 15 WORLD C NOND TE, V3
  • [9] Fatigue crack growth in stiffened steel tubular joints in seawater environment
    Gandhi, P
    Murthy, DSR
    Raghava, G
    Rao, AGM
    [J]. ENGINEERING STRUCTURES, 2000, 22 (10) : 1390 - 1401
  • [10] GOYET J, 2001, M280197 CEPM BUR VER