An independent variable controlled grey fuzzy linear programming approach for waste plow allocation planning

被引:26
|
作者
Zou, R [1 ]
Lung, WS
Guo, HC
Huang, G
机构
[1] Univ Virginia, Dept Civil Engn, Charlottesville, VA 22903 USA
[2] Peking Univ, Ctr Environm Sci, Beijing 100871, Peoples R China
[3] Univ Regina, Fac Engn, Regina, SK S4S 0A2, Canada
关键词
independent variables controlled grey fuzzy linear programming; grey decision; fuzzy decision; uncertainty; optimization; municipal solid waste management;
D O I
10.1080/03052150008940912
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes an independent variable controlled grey fuzzy linear programming (IVC-GFLP) approach to address uncertainty in optimization processes. The IVC-GFLP method improves upon established grey linear programming (GLP) and ordinary grey fuzzy linear programming (GFLP) methods by introducing independent control variables into model formulations. These variables enable the model to address the independent characteristics of constraint uncertainty well. In this paper, the IVC-GFLP approach is applied to a hypothetical case study of municipal solid waste management. Included comparisons between the IVC-GFLP and GLP/GFLP solutions indicate that the IVC-GFLP approach can provide more realistic and applicable solutions than its counterparts.
引用
收藏
页码:87 / 111
页数:25
相关论文
共 50 条
  • [1] WASTE FLOW ALLOCATION PLANNING THROUGH A GREY FUZZY QUADRATIC-PROGRAMMING APPROACH
    HUANG, GH
    BAETZ, BW
    PATRY, GG
    CIVIL ENGINEERING SYSTEMS, 1994, 11 (03): : 209 - 243
  • [2] A GRAY FUZZY LINEAR-PROGRAMMING APPROACH FOR MUNICIPAL SOLID-WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY
    HUANG, GH
    BAETZ, BW
    PATRY, GG
    CIVIL ENGINEERING SYSTEMS, 1993, 10 (02): : 123 - 146
  • [3] A fuzzy-robust stochastic multiobjective programming approach for petroleum waste management planning
    Zhang, Xiaodong
    Huang, Guo H.
    Chan, Christine W.
    Liu, Zhenfang
    Lin, Qianguo
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (10) : 2778 - 2788
  • [4] A fuzzy linear programming approach for municipal solid-waste management under uncertainty
    Fan, Y. R.
    Huang, G. H.
    Li, Y. P.
    Cao, M. F.
    Cheng, G. H.
    ENGINEERING OPTIMIZATION, 2009, 41 (12) : 1081 - 1101
  • [5] GREY INTEGER PROGRAMMING - AN APPLICATION TO WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY
    HUANG, GH
    BAETZ, BW
    PATRY, GG
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 83 (03) : 594 - 620
  • [6] Fuzzy Linear Programming for Capacity Planning in Optical Networks
    Kavian, Yousef S.
    Rejeb, Ridha
    Strobel, Otto
    2010 12TH INTERNATIONAL CONFERENCE ON TRANSPARENT OPTICAL NETWORKS (ICTON), 2011,
  • [7] FLFP: A fuzzy linear fractional programming approach with double -sided fuzziness for optimal irrigation water allocation
    Zhang, Chenglong
    Guo, Ping
    AGRICULTURAL WATER MANAGEMENT, 2018, 199 : 105 - 119
  • [8] Solid waste management under uncertainty: a generalized fuzzy linear programming approach
    Fan, Y. R.
    Huang, G. H.
    Jin, L.
    Suo, M. Q.
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2014, 31 (04) : 331 - 346
  • [9] Irrigation Planning Under Uncertainty—A Multi Objective Fuzzy Linear Programming Approach
    Dattatray G. Regulwar
    Jyotiba B. Gurav
    Water Resources Management, 2011, 25 : 1387 - 1416
  • [10] Fuzzy chance-constrained linear fractional programming approach for optimal water allocation
    Guo, Ping
    Chen, Xiaohong
    Li, Mo
    Li, Jianbing
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (06) : 1601 - 1612