RANKING OF BRIDGE DESIGN ALTERNATIVES: A TOPSIS-FADR METHOD

被引:12
作者
Keshavarz-Ghorabaee, Mehdi [1 ]
Amiri, Maghsoud [1 ]
Zavadskas, Edmundas Kazimieras [2 ]
Turskis, Zenonas [2 ]
Antucheviciene, Jurgita [2 ]
机构
[1] Allameh Tabatabai Univ, Fac Management & Accounting, Dept Ind Management, Tehran, Iran
[2] Vilnius Gediminas Tech Univ, Dept Construct Management & Real Estate, Vilnius, Lithuania
来源
BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING | 2018年 / 13卷 / 03期
关键词
area-based deviation; bridge; fuzzy MCDM; MCDM; ranking of design alternatives; TOPSIS; TOPSIS-FADR; GROUP DECISION-MAKING; PROJECT RISK IDENTIFICATION; FUZZY TOPSIS; MULTICRITERIA ANALYSIS; SUPPORT-SYSTEM; SELECTION; AHP; CRITERIA; MODEL; OPTIMIZATION;
D O I
10.7250/bjrbe.2018-13.413
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bridges are considered as essential structures of the transport infrastructures, which play an essential role in any road network. Therefore, the process of planning and designing bridges needs to be made efficiently. The design of bridges usually consists of two stages: conceptual design and detailed design. Designers make decisions on the overall form of the structure in the conceptual design process. This process is defined as Multi-Criteria Decision-Making problems. In this study, a modified fuzzy Technique for Order of Preference by Similarity to Ideal Solution method to deal with the conceptual design process under uncertainty is proposed. The proposed method uses an area-based deviation ratio to determine the degree of difference between alternatives and reference solutions of the Technique for Order of Preference by Similarity to Ideal Solution method. Using this ratio incorporates the effects of the membership functions into the evaluation process. To illustrate the procedure of the proposed method, an example of multi-criteria assessment of bridge design including three Multi-Criteria Decision-Making problems with quantitative and qualitative criteria is used. For validation of the results of the modified fuzzy Technique for Order of Preference by Similarity to Ideal Solution method, a comparative analysis is also made. The analysis shows that the results of the proposed method are consistent with the other method.
引用
收藏
页码:209 / 237
页数:29
相关论文
共 64 条
  • [31] Application of Fuzzy TOPSIS MADM approach in ranking & underlining the problems of plywood industry in India
    Mittal, Kapil
    Tewari, Puran Chandra
    Khanduja, Dinesh
    Kaushik, Prabhakar
    [J]. COGENT ENGINEERING, 2016, 3 (01):
  • [32] Fuzzy Group Decision Making: A Case Using FTOPSIS in Mega Project Risk Identification and Analysis Concurrently
    Mojtahedi, S. M. H.
    Mousavi, S. M.
    Aminian, A.
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1769 - +
  • [33] Risk Identification and Analysis Concurrently: Group Decision Making Approach
    Mojtahedi, S. M. H.
    Mousavi, S. M.
    Makoui, A.
    [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY, VOLS 1-3, 2008, : 299 - +
  • [34] Mousavi SM, 2016, IRAN J FUZZY SYST, V13, P45
  • [35] An approach to multicriteria fuzzy optimization of a prestressed concrete bridge system considering cost and aesthetic feeling
    Ohkubo, S
    Dissanayake, PBR
    Taniwaki, K
    [J]. STRUCTURAL OPTIMIZATION, 1998, 15 (02) : 132 - 140
  • [36] Application of the TOPSIS and intuitionistic fuzzy set approaches for ranking the life cycle sustainability performance of alternative vehicle technologies
    Onat, Nuri Cihat
    Gumus, Serkan
    Kucukvar, Murat
    Tatari, Omer
    [J]. SUSTAINABLE PRODUCTION AND CONSUMPTION, 2016, 6 : 12 - 25
  • [37] Fuzzy AHP approach for selecting the suitable bridge construction method
    Pan, Nang-Fei
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 17 (08) : 958 - 965
  • [38] AN INTEGRATED FUZZY MCGDM APPROACH FOR SUPPLIER SELECTION PROBLEM
    Polat, Gul
    Eray, Ekin
    Bingol, Befrin Neval
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (07) : 926 - 942
  • [39] A new model for bridge management: part B: decision support system for remediation planning
    Rashidi, Maria
    Samali, Bijan
    Sharafi, Pezhman
    [J]. AUSTRALIAN JOURNAL OF CIVIL ENGINEERING, 2016, 14 (01) : 46 - 53
  • [40] Rashidi Maria., 2012, Journal of Civil Engineering and Architecture, V6, P1149, DOI DOI 10.17265/1934-7359/2012.09.007