A neural network based heuristic for resource-constrained project scheduling

被引:0
|
作者
Shou, YY [1 ]
机构
[1] Zhejiang Univ, Sch Management, Hangzhou 310027, Zhejiang, Peoples R China
来源
ADVANCES IN NEURAL NETWORKS - ISNN 2005, PT 1, PROCEEDINGS | 2005年 / 3496卷
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Resource-constrained project scheduling allocates scarce resources over time to perform a set of activities. Priority rule-based heuristics are the most widely used scheduling methods though their performance depends on the characteristics of the projects. To overcome this deficiency, a feed-forward neural network is designed and integrated into the scheduling scheme so as to automatically select the suitable priority rules for each stage of project scheduling. Testing on Patterson's classic test problems and comparison with other heuristics show that the proposed neural network based heuristic is able to improve the performance of project scheduling.
引用
收藏
页码:794 / 799
页数:6
相关论文
共 50 条
  • [1] HEURISTIC PERFORMANCE AND NETWORK RESOURCE CHARACTERISTICS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1989, 40 (12) : 1145 - 1152
  • [2] Entropy-Based Heuristic for Resource-Constrained Project Scheduling
    Christodoulou, Symeon E.
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (03)
  • [3] A heuristic approach to fuzzy resource-constrained project scheduling
    Yeh, CH
    Pan, HQ
    Willis, RJ
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 423 - 428
  • [4] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [5] Resource-constrained project scheduling:: A critical activity reordering heuristic
    Valls, V
    Quintanilla, S
    Ballestín, F
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 282 - 301
  • [6] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [7] A competitive heuristic solution technique for Resource-Constrained Project Scheduling
    Tormos, P
    Lova, A
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 65 - 81
  • [8] COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DAVIS, EW
    PATTERSON, JH
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08): : 944 - 955
  • [9] Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    Liu, Wanlin
    Zhang, Jingwen
    Li, Wanjun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)
  • [10] Research on resource-constrained project scheduling method based on heuristic priority rules
    Wang, Bing
    Chen, Tinggui
    Zhou, Guanglan
    Xu, Chonghuan
    Computer Modelling and New Technologies, 2014, 18 (01): : 143 - 150