Change orders impact on labor productivity

被引:94
作者
Moselhi, O [1 ]
Assem, I
El-Rayes, K
机构
[1] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M8, Canada
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2005年 / 131卷 / 03期
关键词
D O I
10.1061/(ASCE)0733-9364(2005)131:3(354)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes a study conducted to investigate the impact of change orders on construction productivity and introduces a new neural network model for quantifying this impact. The study is based on a comprehensive literature review and a field investigation of projects constructed in Canada and the USA. The field investigation was carried out over a 6-month period and encompassed 33 actual cases of work packages and contracts. Factors contributing to the adverse effects of change orders on labor productivity are identified and a model presented earlier is expanded to account primarily for the timing of change orders, among other factors. The developed model, as well as four models developed by others, have been incorporated in a prototype software system to estimate the loss of labor productivity due to change orders. A numerical example is presented to demonstrate the use of the developed model, and illustrate its capabilities.
引用
收藏
页码:354 / 359
页数:6
相关论文
共 22 条
[1]  
ABDO D, 1999, NEURAL NETWORK MODEL
[2]  
*AM ASS COST ENG, 1989, P 33 ANN M AACE SKIL
[3]  
[Anonymous], 1996, NEUROSHELL2 US MAN
[4]  
ASSEM I, 2000, THESIS CONCORDIA U M
[5]  
Barrie D., 1996, PROFESSIONAL CONSTRU
[6]  
BENT J, 1988, PROJECT MANAGEMENT E
[7]  
Bruggink M. J., 1997, THESIS U WISCONSIN M
[8]  
BRUNIES RA, 1988, P ANN SEM S PROJ MAN, P386
[9]  
COFFMAN G, 1997, P 5 CONSTR C V ASCE, P141
[10]   Impact of change orders on labor efficiency for electrical construction [J].
Hanna, AS ;
Russell, JS ;
Nordheim, EV ;
Bruggink, MJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (04) :224-232