A deterministic approach to generation and transmission maintenance scheduling with network constraints

被引:28
作者
Marwali, MKC [1 ]
Shahidehpour, SM [1 ]
机构
[1] IIT, Dept Elect & Comp Engn, Chicago, IL 60616 USA
关键词
generation maintenance scheduling; transmission maintenance scheduling; benders decomposition;
D O I
10.1016/S0378-7796(98)00055-8
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Most unit maintenance scheduling packages consider the preventive maintenance schedule of generating units over a 1 or 2 year operational planning period in order to minimize the total operation cost while satisfying system energy requirements and maintenance constraints. In a global maintenance scheduling problem, we propose to consider transmission line maintenance scheduling in generation maintenance scheduling. The inclusion of network constraints in generation unit maintenance will increase the complexity of the problem, so we propose to decompose the global generator/transmission scheduling problem into a master problem and sub-problems using Benders decomposition. In the first stage, a master problem is solved to determine a solution for maintenance schedule decision variables. In the second stage, sub-problems are solved to minimize operation costs while satisfying the network constraints. Benders cuts based on the solution of the sub-problem are introduced to the master problem for improving the existing solution. The iterative procedure continues until an optimal or near optimal solution is found. (C) 1998 Published by Elsevier Science S.A. All rights reserved.
引用
收藏
页码:101 / 113
页数:13
相关论文
共 50 条
[41]   A branch-and-check approach for a wind turbine maintenance scheduling problem [J].
Froger, Aurelien ;
Gendreau, Michel ;
Mendoza, Jorge E. ;
Pinson, Eric ;
Rousseau, Louis-Martin .
COMPUTERS & OPERATIONS RESEARCH, 2017, 88 :117-136
[42]   A Column Generation Approach for Personnel Scheduling with Discrete Uncertain Requirements [J].
Pakpoom, Pattarapong ;
Charnsethikul, Peerayuth .
2018 2ND INTERNATIONAL CONFERENCE ON INFORMATICS AND COMPUTATIONAL SCIENCES (ICICOS), 2018, :185-190
[43]   A column generation approach for the driver scheduling problem with staff cars [J].
Perumal, Shyam S. G. ;
Larsen, Jesper ;
Lusby, Richard M. ;
Riis, Morten ;
Christensen, Tue R. L. .
PUBLIC TRANSPORT, 2022, 14 (03) :705-738
[44]   Accelerated solution of the transmission maintenance schedule problem: a Bayesian optimization approach [J].
Mei, Jingcheng ;
Zhang, Guojiang ;
Qi, Donglian ;
Zhang, Jianliang .
GLOBAL ENERGY INTERCONNECTION-CHINA, 2021, 4 (05) :493-500
[45]   Data-driven nested robust optimization for generation maintenance scheduling considering temporal correlation [J].
Yang, Xiao ;
Li, Yuanzheng ;
Zhao, Yong ;
Yu, Yaowen ;
Lian, Yicheng ;
Hao, Guokai ;
Jiang, Lin .
ENERGY, 2023, 278
[46]   Coordination Between Long-Term Generation Maintenance Scheduling and Short-Term TCUC [J].
Salgado, Kevin ;
Sebastian, David ;
Badaoui, Mohamed .
PROCEEDINGS OF THE 2021 XXIII IEEE INTERNATIONAL AUTUMN MEETING ON POWER, ELECTRONICS AND COMPUTING (ROPEC 2021), 2021,
[47]   A HIERARCHICAL DECOMPOSITION APPROACH FOR TRANSMISSION NETWORK EXPANSION PLANNING [J].
ROMERO, R ;
MONTICELLI, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (01) :373-379
[48]   A multistage stochastic programming approach for preventive maintenance scheduling of GENCOs with natural gas contract [J].
Huang, Zhouchun ;
Zheng, Qipeng Phil .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 287 (03) :1036-1051
[49]   Hydropower preventive maintenance scheduling in a deregulated market: A multi-stage stochastic programming approach [J].
Li, Zhuangzhuang ;
Yang, Ping ;
Yang, Yi ;
Lu, Guanpeng ;
Tang, Yufeng .
ELECTRIC POWER SYSTEMS RESEARCH, 2023, 221
[50]   Multi-objective optimisation of generation maintenance scheduling in restructured power systems based on global criterion method [J].
Sadeghian, Omid ;
Oshnoei, Arman ;
Nikkhah, Saman ;
Mohammadi-Ivatloo, Behnam .
IET SMART GRID, 2019, 2 (02) :203-213