Supply Chain Coordination under Supply Delay Based on Buy-back Contract

被引:0
作者
Liu, Lei [1 ]
Gao, Shan
Jin, Qun
机构
[1] Univ Elect Sci & Technol China, Sch Management & Econ, Chengdu 610054, Sichuan, Peoples R China
来源
INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6 | 2011年
关键词
supply delay; probability of delay; buy-back contract; DEMAND; CAPACITY;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
An optimal ordering model under supply delay in a two-stage supply chain based on buy-back contract is presented. It is showed that the buy-back contract can coordinate the supply chain under the case of supply delay with a lower buy-back price compared to the case without supply delay. Furthermore,. we analyze how the probability of supply delay influences the supply chain. The results show that the buy-back price, optimal ordering quantity and expected profit of the supply chain system are decreasing in the probability of supply delay. The retailer's expected profit is non-monotonic to the probability of supply delay and the supplier's expected profit is decreasing in the probability of supply delay.
引用
收藏
页码:980 / +
页数:2
相关论文
共 10 条
[1]   Managing inventory and supply performance in assembly systems with random supply capacity and demand [J].
Bollapragada, R ;
Rao, US ;
Zhang, J .
MANAGEMENT SCIENCE, 2004, 50 (12) :1729-1743
[2]  
Cachon GP, 2003, HDBK OPER R, V11, P229, DOI 10.1016/s0927-0507(03)11006-7
[3]   A PERIODIC REVIEW, PRODUCTION PLANNING-MODEL WITH UNCERTAIN CAPACITY AND UNCERTAIN DEMAND - OPTIMALITY OF EXTENDED MYOPIC POLICIES [J].
CIARALLO, FW ;
AKELLA, R ;
MORTON, TE .
MANAGEMENT SCIENCE, 1994, 40 (03) :320-332
[4]   A newsvendor's procurement problem when suppliers are unreliable [J].
Dada, Maqbool ;
Petruzzi, Nicholas C. ;
Schwarz, Leroy B. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2007, 9 (01) :9-32
[5]  
Pasternack B., 1985, Marketing Sci, V4, P166, DOI [10.1287/mksc.4.2.166, DOI 10.1287/MKSC.4.2.166]
[6]   Tailored supply chain decision making under price-sensitive stochastic demand and delivery uncertainty [J].
Ray, SB ;
Li, SL ;
Song, YY .
MANAGEMENT SCIENCE, 2005, 51 (12) :1873-1891
[7]   Inventory management with advance demand information and flexible delivery [J].
Wang, Tong ;
Toktay, Beril L. .
MANAGEMENT SCIENCE, 2008, 54 (04) :716-732
[8]  
Xiao Yu-ming, 2008, Control and Decision, V23, P905
[9]  
Xu ZG, 2008, Scheme of the classification of the minerogenetic units in China, P1
[10]  
[于辉 Yu Hui], 2005, [系统工程理论与实践, Systems Engineering-Theory & Practice], V25, P38