Causes of bleeding in a hot-in-place asphalt pavement

被引:18
作者
Park, Taesoon [1 ]
机构
[1] Seoul Natl Univ Technol, Dept Civil Engn, Seoul, South Korea
关键词
hot-in-place recycling; rehabilitation; overlay; bleeding;
D O I
10.1016/j.conbuildmat.2007.06.008
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Hot-in-place recycling was used to rehabilitate a section of roadway in State highway. A 25-mm overlay was placed over the recycled layer. Shortly after construction, moderate to severe bleeding was observed in isolated areas throughout the recycled section. This study was carried out to investigate the potential causes of the bleeding of the pavement. The field observation and laboratory tests were conducted. The laboratory tests were performed using core samples taken from the bleeding and non-bleeding areas of the pavement. The test results showed that the bleeding was associated with the surface layer and tack coat. This paper demonstrates that hot-in-place recycling is viable method for correcting distress asphalt pavement. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2023 / 2030
页数:8
相关论文
共 12 条
  • [1] Pavement design with central plant hot-mix recycled asphalt mixes
    Aravind, K.
    Das, Animesh
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2007, 21 (05) : 928 - 936
  • [2] BROWN ER, 1989, J ASS ASPHALT PAVING, V58, P1
  • [3] BUTTON JW, 1995, 1507 NAT RES COUNC, P51
  • [4] EMERY JJ, 1989, P 34 ANN C CAN TECHN, P34
  • [5] FORD M, 1988, 67 ANN TRANSP RES RE
  • [6] FYVIE KR, 1989, P 34 ANN C CAN TECHN, V34, P258
  • [7] Huber G. A., 1987, Proc., V56, P33
  • [8] KANDHAL PS, 1987, 1106 TRANSP RES, V2
  • [9] LANE KR, 1981, FHWACTRD64728114 CON
  • [10] SHOENBERGER JE, 1990, GL9022 US ARM CORPS