A two-stage integrating optimization of production scheduling, maintenance and quality

被引:15
作者
Zheng, Jiafei [1 ]
Yang, Hongbing [1 ]
Wu, Qingsong [1 ]
Wang, Ziyang [1 ]
机构
[1] Soochow Univ, Sch Mech & Elect Engn, Suzhou 215006, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Production scheduling; preventive maintenance; quality; control chart; genetic algorithm; PREVENTIVE MAINTENANCE; SUBJECT; SYSTEM; POLICY; MODEL;
D O I
10.1177/0954405420921733
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
During the process of actual production, production scheduling, preventive maintenance and quality control have a close interaction with each other and thus need to be integrated for improving manufacturing system performance. The aim of this article is to jointly optimize the job sequence, the preventive maintenance locations, the preventive maintenance interval and decision variables of control chart such that the expected cost per unit time and penalty cost due to schedule delay are minimized. A two-stage integrating optimization model of production scheduling, maintenance and quality in a single machine system is developed. A control chart is adopted to monitor the whole process with Taguchi's loss function estimating the quality cost of each condition and perfect preventive maintenance activity is conducted at the end of each interval. A genetic algorithm is designed to solve this model in order to obtain the optimal job sequence and the locations of preventive maintenance. Numerical examples and thorough sensitivity analyses are provided to illustrate the proposed integrated model. Finally, the efficiency of the proposed two-stage integration model is verified by the comparison of the stand-alone model under the same condition. Compared with the stand-alone model, the proposed integrated method can save the cost rate by 12%-42% under five different situations.
引用
收藏
页码:1448 / 1459
页数:12
相关论文
共 34 条
[1]   Joint planning of production and maintenance in a single machine deteriorating system [J].
Beheshti-Fakher, H. ;
Nourelfath, M. ;
Gendreau, M. .
IFAC PAPERSONLINE, 2016, 49 (12) :745-750
[2]   Economic lot scheduling problem with imperfect production processes [J].
Ben-Daya, M ;
Hariga, M .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2000, 51 (07) :875-881
[3]   Integrated production maintenance and quality model for imperfect processes [J].
Ben-Daya, M .
IIE TRANSACTIONS, 1999, 31 (06) :491-501
[4]   Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint [J].
Bouslah, B. ;
Gharbi, A. ;
Pellerin, R. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 61 :110-126
[5]   Joint production, quality and maintenance control of a two-machine line subject to operation-dependent and quality-dependent failures [J].
Bouslah, Bassem ;
Gharbi, Ali ;
Pellerin, Robert .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 195 :210-226
[6]   Minimizing number of tardy jobs on a single machine subject to periodic maintenance [J].
Chen, Wen-Jinn .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2009, 37 (03) :591-599
[7]   An optimal production and inspection strategy with preventive maintenance error and rework [J].
Chen, Yan-Chun .
JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) :99-106
[8]   Product reliability-oriented optimization design of time-between-events control chart system for high-quality manufacturing processes [J].
Chen, Zhaoxiang ;
He, Yihai ;
Cui, Jiaming ;
Han, Xiao ;
Zhao, Yixiao ;
Zhang, Anqi ;
Zhou, Di .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2020, 234 (03) :549-558
[9]   Integrated production, quality control and condition-based maintenance for imperfect production systems [J].
Cheng, Guo Qing ;
Zhou, Bing Hai ;
Li, Ling .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 175 :251-264
[10]   Modeling condition-based maintenance and replacement strategies for an imperfect production-inventory system [J].
Cheng, Guoqing ;
Zhou, Binghai ;
Qi, Faqun ;
Li, Ling .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2018, 232 (10) :1858-1871