Construction works in developing countries: The problems and solutions
被引:0
|
作者:
Sasanuma, M
论文数: 0引用数: 0
h-index: 0
Sasanuma, M
机构:
来源:
CIVIL ENGINEERING IN THE ASIA REGION: ASIAN INFRASTRUCTURE, SUSTAINABLE DEVELOPMENT AND PROJECT MANAGEMENT
|
1998年
关键词:
D O I:
暂无
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
Insufficient funds for project surveys; too short a period for planning; exacerbated by non-existence of essential statistics. Academically well qualified but relatively inexperienced consultants for design work. Problematic bidding process--choice of the cheapest, not the best contractor. Weak supervision and inspection system. Uncertainty regarding budgetary appropriations for maintenance and rehabilitation. Unfavorable environment for construction industry development, especially for small-scale construction businesses in the countryside.