Using a deterministic time-lagged ensemble forecast with a probabilistic threshold for improving 6-15 day summer precipitation prediction in China

被引:15
作者
Jie, Weihua [1 ]
Wu, Tongwen [1 ]
Wang, Jun [2 ]
Li, Weijing [1 ]
Polivka, Thomas [2 ]
机构
[1] China Meteorol Adm, Beijing Climate Ctr, Beijing, Peoples R China
[2] Univ NE Lincoln, Dept Earth & Atmospher Sci, Lincoln, NE USA
关键词
Precipitation; 6-15 day forecasts; Ensemble forecasting; UNITED-STATES; PART II; WEATHER; MODEL; FRAMEWORK; ECMWF; PREDICTABILITY; SYSTEM; SKILL;
D O I
10.1016/j.atmosres.2015.01.004
中图分类号
P4 [大气科学(气象学)];
学科分类号
0706 ; 070601 ;
摘要
A Deterministic Time-lagged Ensemble Forecast using a Probabilistic Threshold (DEFPT) method is suggested for improving summer 6-15 day categorical precipitation prediction in China from the Beijing Climate Center Atmospheric General Circulation Model version 2.1 (BCC_AGCM2.1). It is based on a time-lagged ensemble system that consists of 13 ensemble members separated sequentially at 6 hour intervals lagging the last three days. The DEFPT is not intended to predict the probability of rainfall, but rather to forecast rainfall. (yes/no) occurrence for different categories of precipitation at any model grid box. A given categorical precipitation is forecasted to occur at one gridbox only when the ensemble probability for that categorical precipitation exceeds a certain threshold. This method is useful for providing an estimate of whether precipitation events will occur to decision-makers based on probabilistic forecasts during days 6-15. A large number of hindcast experiments for 1996-2005 summers reveal that this threshold can be best (and empirically) set as 5/13 and 4/13 respectively for the 6-15 day prediction of 1 + mm (i.e., above 1 mm per day) and 5 + mm rainfall events, using the Relative Operating Characteristic (ROC) curve, the Equitable Threat Score (ETS), the Hanssen and Kuipers (HK) score, and frequency bias (BIA) to achieve best prediction performance. With this set of thresholds, the DEFPT shows skill improvement over the corresponding single deterministic forecast using one initial value and the Time-Lagged Average Forecast (LAF) ensemble method. Similar improvements by the DEFPT are also found for the prediction of several other categories of precipitation between 1 + mm and 10 + mm per day. Application of DEFPT to larger ensemble size and BCC_AGCM version 2.2 with a higher horizontal resolution also demonstrates the effectiveness of the DEFPT for 6-15 day categorical precipitation forecasts. (C) 2015 The Authors. Published by Elsevier B.V.
引用
收藏
页码:142 / 159
页数:18
相关论文
共 69 条
[1]  
[Anonymous], 1982, Aust. Meteorol. Mag.
[2]  
[Anonymous], 1965, Meded. Verh
[3]  
Bright D.R., 2004, 22 C SEV LOC STORMS
[4]  
Buizza R, 1999, WEATHER FORECAST, V14, P168, DOI 10.1175/1520-0434(1999)014<0168:PPOPUT>2.0.CO
[5]  
2
[6]   Continuous Production of Lipase-Catalyzed Biodiesel in a Packed-Bed Reactor: Optimization and Enzyme Reuse Study [J].
Chen, Hsiao-Ching ;
Ju, Hen-Yi ;
Wu, Tsung-Ta ;
Liu, Yung-Chuan ;
Lee, Chih-Chen ;
Chang, Cheng ;
Chung, Yi-Lin ;
Shieh, Chwen-Jen .
JOURNAL OF BIOMEDICINE AND BIOTECHNOLOGY, 2011,
[7]  
Cressman GP., 1959, Mon. Weather Rev., V87, P367, DOI [DOI 10.1175/1520-0493(1959)087<0367:AOOAS>2.0.CO
[8]  
2, 10.1175/1520-0493(1959)087]
[9]  
DALCHER A, 1988, MON WEATHER REV, V116, P402, DOI 10.1175/1520-0493(1988)116<0402:MRLAF>2.0.CO
[10]  
2