A simple and logical alternative for making PERT time estimates

被引:20
作者
Lau, AHL
Lau, HS
Zhang, Y
机构
[1] College of Business Administration, Oklahoma State University, Stillwater, OK
关键词
D O I
10.1080/07408179608966265
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The two standard steps for estimating PERT times are: Step 1, estimate a, m, and b; and Step 2, use the 'classical' formulae mu = (a + 4m + b)/6 and sigma = (b - a)/6. We review the shortcomings of the textbook definitions of a, m and b; we also review the inconsistency of Step 1 with the literature on probability elicitation. A 5- or 7-fractile alternative is then proposed and justified for Step 1. Next, we develop simple but very accurate formulae for computing mu and sigma with the fractiles estimated in our Step 1. For contrast, we also show that the classical PERT formulae are very inaccurate, even for the very restricted subset of beta distributions for which the formulae are supposedly applicable. Our overall purpose is to combine earlier findings with some new results to argue that: (i) the classical PERT formulae are both illogical and inaccurate, so we should not continue to teach and use them; and (ii) simple and more logical alternatives are available.
引用
收藏
页码:183 / 192
页数:10
相关论文
共 41 条
[1]  
ALPERT M, 1969, PROGR REPORT TRAININ
[2]  
[Anonymous], 1979, PRODUCTION INVENTORY
[3]  
Chase R.B., 1989, Production and Operations Management: A Life Cycle Approach, V5th
[4]  
CHESLEY GR, 1975, ACCOUNT REV, V60, P325
[5]  
Cleland DI., 1975, SYSTEMS ANAL PROJECT
[6]  
DECOSTER D, 1974, ACCOUNTING MANAGERIA
[7]   ESTIMATION OF MEAN AND VARIANCE OF A PERT ACTIVITY TIME [J].
DONALDSON, WA .
OPERATIONS RESEARCH, 1965, 13 (03) :382-+
[8]  
FOGARTY DW, 1983, PRODUCTION INVENTORY
[9]  
Frankel E. G., 1990, PROJECT MANAGEMENT E
[10]   A NOTE ON PERT ASSUMPTIONS [J].
GALLAGHER, C .
MANAGEMENT SCIENCE, 1987, 33 (10) :1360-1360