共 50 条
- [36] Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lags Operational Research, 2015, 15 : 95 - 114
- [38] Supply Chain Scheduling with Transportation Cost On a Single Machine ADVANCED RESEARCH ON ADVANCED STRUCTURE, MATERIALS AND ENGINEERING, 2012, 382 : 106 - 109
- [39] Hybrid heuristics for the single machine scheduling problem with quadratic earliness and tardiness costs International Journal of Machine Learning and Cybernetics, 2012, 3 : 327 - 333