Mathematical programming and solution approaches for minimizing tardiness and transportation costs in the supply chain scheduling problem

被引:32
|
作者
Tamannaei, Mohammad [1 ,2 ]
Rasti-Barzoki, Morteza [1 ,2 ]
机构
[1] Isfahan Univ Technol, Dept Transportat Engn, Esfahan 8415683111, Iran
[2] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan 8415683111, Iran
关键词
Supply chain scheduling; Transportation; Tardiness; Mathematical programming; Branch-and-Bound; Genetic algorithm; TOTAL WEIGHTED TARDINESS; DUE-DATE ASSIGNMENT; DEPENDENT SETUP TIMES; TARDY JOBS; BOUND ALGORITHM; SEARCH; NUMBER; DELIVERIES;
D O I
10.1016/j.cie.2018.11.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A new integrated supply chain scheduling and vehicle routing problem is developed here. The objective is to minimize the total weighted tardiness and transportation costs, with respect to fixed costs of vehicles and travelling costs of the network. The problem is strong NP-Hard. A mixed integer linear programming and two solution approaches, where one exact procedure based on Branch-and-Bound (B&B) algorithm, and one meta heuristic genetic algorithm (GA) are proposed to solve this problem. Computational experiments are run for both small and large-scale analyses. The results of small-scale analysis indicate that the proposed B&B algorithm provides a more efficient performance, with respect to both number of optimally-solved problems and run times, in comparison with that of the CPLEX software. The results indicate the capability of meta-heuristic GA, in solving real-life large-scale problems in an efficient manner.
引用
收藏
页码:643 / 656
页数:14
相关论文
共 50 条
  • [21] Minimizing total tardiness in an unrelated parallel-machine scheduling problem
    Shim, S-O
    Kim, Y-D
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (03) : 346 - 354
  • [22] An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem
    Ranjbar, Mohammad
    Khalilzadeh, Mohammad
    Kianfar, Fereydoon
    Etminani, Kobra
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (01) : 264 - 270
  • [23] Modelling and Optimization of a Supply Chain Scheduling Problem
    Guo, Zhaoxia
    Yang, Can
    Chen, Longchao
    Yang, Jing
    2015 International Conference on Computer and Computational Sciences (ICCCS), 2015, : 142 - 145
  • [24] The Modeling of Optimization and Decline Transportation Costs in Supply Chain System
    Shafiee, Morteza
    Roshanaee, Mehri
    ECONOMICS AND FINANCE RESEARCH, 2011, 4 : 138 - 142
  • [25] A Faster FPTAS for a Supply Chain Scheduling Problem to Minimize Holding Costs with Outsourcing
    Liu, Shang-Chia
    Wu, Chin-Chia
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2016, 33 (05)
  • [26] A three-agent scheduling problem for minimizing the total tardiness on a single machine
    Lee, Wen-Chiung
    Wang, Jen-Ya
    PROCEEDINGS 2016 5TH IIAI INTERNATIONAL CONGRESS ON ADVANCED APPLIED INFORMATICS IIAI-AAI 2016, 2016, : 664 - 668
  • [27] A Solution for Transportation Planning in Supply Chain
    Modares, A.
    Sepehri, M.
    SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2009, 16 (02): : 149 - 158
  • [28] PRESENTING A MATHEMATICAL PROGRAMMING MODEL FOR ROUTING AND SCHEDULING OF CROSS-DOCK AND TRANSPORTATION
    Tavallali, P. A.
    Feylizadeh, M. R.
    Amindoust, A.
    POLISH JOURNAL OF MANAGEMENT STUDIES, 2020, 22 (01): : 545 - 564
  • [29] Pseudo-polynomial dynamic programming for an integrated due date assignment, resource allocation, production, and distribution scheduling model in supply chain scheduling
    Rasti-Barzoki, Morteza
    Hejazi, Seyed Reza
    APPLIED MATHEMATICAL MODELLING, 2015, 39 (12) : 3280 - 3289
  • [30] Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA
    Yu, Andrew Junfang
    Seif, Javad
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 97 : 26 - 40