Mathematical programming and solution approaches for minimizing tardiness and transportation costs in the supply chain scheduling problem

被引:32
|
作者
Tamannaei, Mohammad [1 ,2 ]
Rasti-Barzoki, Morteza [1 ,2 ]
机构
[1] Isfahan Univ Technol, Dept Transportat Engn, Esfahan 8415683111, Iran
[2] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan 8415683111, Iran
关键词
Supply chain scheduling; Transportation; Tardiness; Mathematical programming; Branch-and-Bound; Genetic algorithm; TOTAL WEIGHTED TARDINESS; DUE-DATE ASSIGNMENT; DEPENDENT SETUP TIMES; TARDY JOBS; BOUND ALGORITHM; SEARCH; NUMBER; DELIVERIES;
D O I
10.1016/j.cie.2018.11.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A new integrated supply chain scheduling and vehicle routing problem is developed here. The objective is to minimize the total weighted tardiness and transportation costs, with respect to fixed costs of vehicles and travelling costs of the network. The problem is strong NP-Hard. A mixed integer linear programming and two solution approaches, where one exact procedure based on Branch-and-Bound (B&B) algorithm, and one meta heuristic genetic algorithm (GA) are proposed to solve this problem. Computational experiments are run for both small and large-scale analyses. The results of small-scale analysis indicate that the proposed B&B algorithm provides a more efficient performance, with respect to both number of optimally-solved problems and run times, in comparison with that of the CPLEX software. The results indicate the capability of meta-heuristic GA, in solving real-life large-scale problems in an efficient manner.
引用
收藏
页码:643 / 656
页数:14
相关论文
共 50 条
  • [1] Minimizing sum of the due date assignment costs, maximum tardiness and distribution costs in a supply chain scheduling problem
    Assarzadegan, Parisa
    Rasti-Barzoki, Morteza
    APPLIED SOFT COMPUTING, 2016, 47 : 343 - 356
  • [2] COORDINATION OF PRODUCTION AND TRANSPORTATION IN SUPPLY CHAIN SCHEDULING
    Pei, Jun
    Pardalos, Panos M.
    Liu, Xinbao
    Fan, Wenjuan
    Yang, Shanlin
    Wang, Ling
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (02) : 399 - 419
  • [3] Mathematical programming and three metaheuristic algorithms for a bi-objective supply chain scheduling problem
    Zarei, Hamid
    Rasti-Barzoki, Morteza
    NEURAL COMPUTING & APPLICATIONS, 2019, 31 (12) : 9073 - 9093
  • [4] Multi-agent supply chain scheduling problem by considering resource allocation and transportation
    Aminzadegan, Sajede
    Tamannaei, Mohammad
    Rasti-Barzoki, Morteza
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [5] Minimizing earliness and tardiness costs in stochastic scheduling
    Baker, Kenneth R.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 236 (02) : 445 - 452
  • [6] A systematic review of mathematical programming models and solution approaches for the textile supply chain
    Alves, Giovanna Abreu
    Tavares, Roberto
    Amorim, Pedro
    Camargo, Victor Claudio Bento
    COMPUTERS & INDUSTRIAL ENGINEERING, 2025, 202
  • [8] Minimizing total resource consumption and total tardiness penalty in a resource allocation supply chain scheduling and vehicle routing problem
    Hassanzadeh, Alborz
    Rasti-Barzoki, Morteza
    APPLIED SOFT COMPUTING, 2017, 58 : 307 - 323
  • [9] Minimizing total tardiness in a scheduling problem with a learning effect
    Eren, Tamer
    Guner, Ertan
    APPLIED MATHEMATICAL MODELLING, 2007, 31 (07) : 1351 - 1361
  • [10] Mathematical programming and three metaheuristic algorithms for a bi-objective supply chain scheduling problem
    Hamid Zarei
    Morteza Rasti-Barzoki
    Neural Computing and Applications, 2019, 31 : 9073 - 9093