Progress and Challenges in the Construction of Wendelstein 7-X

被引:0
作者
Braeuer, Torsten [1 ]
Klinger, Thomas [1 ]
Bosch, Hans-Stephan [1 ]
机构
[1] EURATOM, Max Planck Inst Plasmaphys, D-17491 Greifswald, Germany
来源
2011 IEEE/NPSS 24TH SYMPOSIUM ON FUSION ENGINEERING (SOFE) | 2011年
关键词
components; Stellarator; Wendelstein; 7-X; assembly; component alignment; metrology; mock up;
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
This paper reports on experiences gained during the construction of the large, superconducting, optimized stellarator device Wendelstein 7-X. The goal of the project is to demonstrate the fusion reactor potential of optimized stellarators and to operate for the first time fusion-relevant plasmas under full steady-state conditions. In addition the validity of the engineering concept is to be proven under operating conditions. The actual construction of the device is now running since more than ten years and will require about three further years of assembly and integration. The current technical status of Wendelstein 7-X is reviewed, the major construction challenges are highlighted, and conclusions are drawn from past experiences that may also be useful for other large-scale science projects.
引用
收藏
页数:6
相关论文
共 7 条
[1]   Construction of Wendelstein 7-X-Engineering a Steady-State Stellarator [J].
Bosch, Hans-Stephan ;
Erckmann, V. ;
Koenig, Ralf W. T. ;
Schauer, Felix ;
Stadler, Reinhold J. ;
Werner, A. .
IEEE TRANSACTIONS ON PLASMA SCIENCE, 2010, 38 (03) :265-273
[2]   PHYSICS OPTIMIZATION OF STELLARATORS [J].
GRIEGER, G ;
LOTZ, W ;
MERKEL, P ;
NUHRENBERG, J ;
SAPPER, J ;
STRUMBERGER, E ;
WOBIG, H ;
BURHENN, R ;
ERCKMANN, V ;
GASPARINO, U ;
GIANNONE, L ;
HARTFUSS, HJ ;
JAENICKE, R ;
KUHNER, G ;
RINGLER, H ;
WELLER, A ;
WAGNER, F .
PHYSICS OF FLUIDS B-PLASMA PHYSICS, 1992, 4 (07) :2081-2091
[3]   Test Results of the High Temperature Superconductor Prototype Current Leads for Wendelstein 7-X [J].
Heller, R. ;
Drotziger, S. ;
Fietz, W. H. ;
Fink, S. ;
Heiduk, M. ;
Kienzler, A. ;
Lange, C. ;
Lietzow, R. ;
Moehring, T. ;
Rohr, P. ;
Rummel, T. ;
Moennich, T. ;
Buscher, K. -P. .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2011, 21 (03) :1062-1065
[4]   The busbar system for Wendelstein 7-X prepared for assembly and operational loads [J].
Neubauer, O. ;
Charl, A. ;
Czymek, G. ;
Giesen, B. ;
Sauer, M. ;
Scheibl, L. ;
Schruff, J. ;
Schick, R. ;
Panin, A. ;
John, A. ;
Jung, S. ;
Rummel, K. ;
Wegener, L. .
FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) :1416-1419
[5]   Design, Tests, and Repair Procedures for the Electrical Insulation of the Superconducting W7-X Magnets [J].
Risse, Konrad ;
Rummel, Th ;
Ehrke, G. ;
Koeppen, M. .
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2010, 20 (03) :447-450
[6]   The in-vessel components of the experiment WENDELSTEIN 7-X [J].
Stadler, R. ;
Vorkoeper, A. ;
Boscary, J. ;
Cardella, A. ;
Hurd, F. ;
Li, Ch. ;
Mendelevitch, B. ;
Peacock, A. ;
Pirsch, H. .
FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) :305-308
[7]   Status of Wendelstein 7-X construction [J].
Wegener, L. .
FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) :106-112