Nonlinear forward-iteration method for cable-stayed bridge
被引:0
作者:
Chen, Changsong
论文数: 0引用数: 0
h-index: 0
机构:
Changsha Univ Sci & Technol, Sch Bridge & Struct Engn, Changsha 410076, Peoples R ChinaChangsha Univ Sci & Technol, Sch Bridge & Struct Engn, Changsha 410076, Peoples R China
Chen, Changsong
[1
]
Yan, Donghuang
论文数: 0引用数: 0
h-index: 0
机构:
Changsha Univ Sci & Technol, Sch Bridge & Struct Engn, Changsha 410076, Peoples R ChinaChangsha Univ Sci & Technol, Sch Bridge & Struct Engn, Changsha 410076, Peoples R China
Yan, Donghuang
[1
]
Chen, Zhengqing
论文数: 0引用数: 0
h-index: 0
机构:
Hunan Univ, Civil Engn Coll, Changsha 410075, Peoples R ChinaChangsha Univ Sci & Technol, Sch Bridge & Struct Engn, Changsha 410076, Peoples R China
Chen, Zhengqing
[2
]
机构:
[1] Changsha Univ Sci & Technol, Sch Bridge & Struct Engn, Changsha 410076, Peoples R China
[2] Hunan Univ, Civil Engn Coll, Changsha 410075, Peoples R China
来源:
INTEGRATED APPROACHES FOR MATERIALS AND STRUCTURAL SAFETY
|
2007年
关键词:
bridge engineering;
geometric nonlinearity;
construction control;
cable-stayed bridge;
iteration method;
D O I:
暂无
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
If the geometric nonlinear effects are considered in the forward analysis for cable-stayed bridges in the construction period, the determination of controlling parameters for construction control should be a nonlinear iteration process. A method for the calculation of internal forces and deformations of the girders in super-long span cable-stayed bridges has been developed. A steel cable-stayed bridge with the main span of 1088 meters is taken as an example to show the validity of the proposed method.