An approach for joint scheduling of production and predictive maintenance activities

被引:25
作者
Bencheikh, Ghita [1 ]
Letouzey, Agnes [1 ]
Desforges, Xavier [1 ]
机构
[1] Univ Toulouse, Lab Genie Prod, INP ENIT, F-65016 Tarbes, France
关键词
Scheduling problem; Predictive maintenance; Prognostics and health management; Multi -agent systems; MANUFACTURING SYSTEMS; OPTIMIZATION; ARCHITECTURE; ALGORITHMS; FRAMEWORK; FLOWSHOP; DESIGN; AGENTS; MODEL;
D O I
10.1016/j.jmsy.2022.08.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Industry 4.0 paradigm, thanks to the deployment of cutting-edge technologies enabling the deployment of new services, contributes to improve the agility of productive organizations. Among these services, the Prog-nostic and Health Management (PHM) contributes to the health assessment of the manufacturing resources and to prognose their future conditions by providing decision supports for production and predictive maintenance management. However, the future conditions of technical production resources depend on the productive tasks they will have to carry out. If their future conditions will not satisfy production criteria, maintenance tasks will have to be planned and productive tasks will be delayed or assigned to other resources for which their future conditions considering these new tasks must be assessed. In this context, a multi-agent system SCEMP (Super-visor, Customers, Environment, Maintainers and Producers) is here proposed in which production scheduling and predictive maintenance planning collaborate and exploit decision supports provided by PHM modules. The proposed multi-agent system provides a framework in which production and the predictive maintenance ac-tivities can be scheduled simultaneously by compromising on their objectives. During the scheduling process, SCEMP enables to identify the needed predictive maintenance from the assignments of production tasks to machines, the machine component prognoses and machine models. It schedules production tasks and predictive maintenance activities according to the number, competencies and availabilities of production and maintenance resources. The SCEMP framework is described and presented in the tough job shop context. For this context, case studies have been generated and scheduled within acceptable computation times. To illustrate the SCEMP functioning, some case studies are detailed with the obtained performances. It is flexible and can be adapted to various manufacturing situations. It can also be used to assess the interest of implementing prognostic functions for machine components.
引用
收藏
页码:546 / 560
页数:15
相关论文
共 67 条
[31]  
Le Pape C., 1994, Intelligent Systems Engineering, V3, P55, DOI 10.1049/ise.1994.0009
[32]   A Cyber-Physical Systems architecture for Industry 4.0-based manufacturing systems [J].
Lee, Jay ;
Bagheri, Behrad ;
Kao, Hung-An .
Manufacturing Letters, 2015, 3 :18-23
[33]   Potential of a Multi-Agent System Approach for Production Control in Smart Factories [J].
Leusin, Matheus E. ;
Kueck, Mirko ;
Frazzon, Enzo M. ;
Maldonado, Mauricio U. ;
Freitag, Michael .
IFAC PAPERSONLINE, 2018, 51 (11) :1459-1464
[34]   Single-machine-based joint optimization of predictive maintenance planning and production scheduling [J].
Liu Qinming ;
Dong Ming ;
Chen, F. F. ;
Lv Wenyuan ;
Ye Chunming .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 55 :173-182
[35]  
Memon MA, 2013, IEEE INT C NETW SENS, P603, DOI 10.1109/ICNSC.2013.6548807
[36]  
Miles R, 2006, LEARNING UML 2 0
[37]   Agent-based systems for manufacturing [J].
Monostori, L. ;
Vancza, J. ;
Kumara, S. R. T. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2006, 55 (02) :697-720
[38]   A cloud-based cyber-physical system for adaptive shop-floor scheduling and condition-based maintenance [J].
Mourtzis, Dimitris ;
Vlachou, Ekaterini .
JOURNAL OF MANUFACTURING SYSTEMS, 2018, 47 :179-198
[39]  
Nikolic B., 2017, Predictive Manufacturing Systems in Industry 4.0: Trends, P0796, DOI DOI 10.2507/28TH.DAAAM.PROCEEDINGS.112
[40]  
Odell J., 1998, ADV OBJECT ORIENTED