The research on risk evaluation and pre-warning mechanism of IT outsourcing

被引:0
作者
Wang Lei [1 ]
Wu Zhongyuan [1 ]
机构
[1] Tianjin Polytech Univ, Sch Management, Tianjin 300384, Peoples R China
来源
PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM | 2007年
关键词
IT outsourcing; risk evaluation; gray-fuzzy evaluation; risk pre-warning mechanism;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
By now few researches deal with quantitative evaluation on risks of IT(information technology) outsourcing. In view of the characters of IT outsourcing, IT outsourcing can be divided into four stages as feasibility analysis stage, selections of IT outsourcing vendor, IT outsourcing vendor management and evaluation, terminate or continue outsourcing decision. According to every stage of outsourcing workflow,the paper builds the evaluation index system to calculate with the method of gray-fuzzy synthetic evaluation and deal with evaluation result quantitatively to build the risk evaluation system of IT outsourcing. Comparing the evaluation result with enterprise risk degree, can made outsourcing prewarning mechanism.
引用
收藏
页码:1315 / 1318
页数:4
相关论文
共 5 条
  • [1] [Anonymous], INT J COMPUT INTERNE
  • [2] Validating measures of information technology outsourcing risk factors
    Bahli, B
    Rivard, S
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2005, 33 (02): : 175 - 187
  • [3] LIU B, 2006, COMMERCIAL RES, V346, P98
  • [4] SU HC, 1997, GREY FUZZY COMPREHEN, P48
  • [5] Zhang J, 2005, APPL MATH MECH-ENGL, V26, P139