The role of formal and informal mechanisms in implementing lean principles in construction projects

被引:21
作者
Bygballe, Lena Elisabeth [1 ]
Endresen, Maria [2 ]
Falun, Silje [3 ]
机构
[1] BI Norwegian Business Sch, Oslo, Norway
[2] PwC, Oslo, Norway
[3] EY, Oslo, Norway
关键词
Innovation; Construction; Case study; INNOVATION; COLLABORATION; PERFORMANCE; MANAGEMENT; MODELS;
D O I
10.1108/ECAM-07-2017-0138
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Previous research shows that implementing lean construction is not a straightforward task. The purpose of this paper is to examine the role of formal and informal mechanisms in implementing lean principles in construction projects. Design/methodology/approach The paper draws on a single case study of the implementation of innovative lean principles in a public construction project in Norway. The study is based on qualitative data, including 17 semi-structured interviews with 21 individuals, document analysis, and observations in meetings and seminars, in addition to informal conversations. Findings Formal mechanisms, including contractual arrangements, have the potential to both facilitate and hamper the implementation of innovative lean principles in a construction project. They might create coherence, but at the same time they might limit the scope of the concept in such a way that others do not accept it. Informal mechanisms, including social and lateral relationships and trust aid implementation, both directly by creating commitment and by modifying the challenges that the formal mechanisms potentially incur. Formal mechanisms may, in turn, nurture the informal ones. Research limitations/implications The research is based on a single case study within the Norwegian public sector, which is dependent on specific public procurement regulations and subject to strong contractual traditions. Originality/value The research extends the existing knowledge of implementation of lean construction in the construction industry. It helps refining the understanding of the role played by formal and informal mechanisms, and the interplay between them in the implementation process. This knowledge is also relevant for process innovations in construction in general.
引用
收藏
页码:1322 / 1338
页数:17
相关论文
共 49 条
[1]   Improving construction management practice with the Last Planner System: a case study [J].
AlSehaimi, Abdullah ;
Fazenda, Patricia ;
Koskela, Lauri .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (01) :51-+
[2]   Exploring lean construction practice, research, and education [J].
Alves, Thais ;
Milberg, Colin ;
Walsh, Kenneth .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (05) :512-+
[3]   Applying lean thinking in construction and performance improvement [J].
Aziz, Remon Fayek ;
Hafez, Sherif Mohamed .
ALEXANDRIA ENGINEERING JOURNAL, 2013, 52 (04) :679-695
[4]   Lean project management [J].
Ballard, G ;
Howell, GA .
BUILDING RESEARCH AND INFORMATION, 2003, 31 (02) :119-133
[5]   Shielding production: Essential step in production control [J].
Ballard, G ;
Howell, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (01) :11-17
[6]  
Ballard G., 2008, LEAN CONSTRUCTION J, V2, P1
[7]  
Ballard G., 2000, The Last Planner System of Production Control
[8]  
Blayse A. M., 2004, Construction Innovation, V4, P143, DOI 10.1191/1471417504ci073oa
[9]  
Bresnen M., 2000, CONSTR MANAG ECON, V18, P229, DOI DOI 10.1080/014461900370852
[10]  
Bresnen M., 2002, INT J PROJ MANAG, V20, P497, DOI DOI 10.1016/S0263-7863(01)00043-6