Multiperiod model for the optimal production planning in the industrial gases sector

被引:13
|
作者
Fernandez, David [1 ,2 ]
Pozo, Carlos [3 ]
Folgado, Ruben [1 ]
Guillen-Gosalbez, Gonzalo [2 ,3 ]
Jimenez, Laureano [2 ]
机构
[1] Messer Iber Gases SAU, Autovia Tarragona Salou,Km 3-8, Tarragona 43480, Spain
[2] Univ Rovira & Virgili, Dept Engn Quim, Ave Paisos Catalans,26, E-43007 Tarragona, Spain
[3] Imperial Coll London, Ctr Proc Syst Engn, Dept Chem Engn, South Kensington Campus, London SW7 2AZ, England
关键词
Energy-intensive process; Multiperiod model; Optimization; Production scheduling; Cryogenic air separation; OPTIMIZATION; DEMAND; OPERATION; NETWORK; COMPRESSORS; APPLIANCES; BUILDINGS; REDUCTION; SAVINGS; DESIGN;
D O I
10.1016/j.apenergy.2017.08.064
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Cryogenic air separation to produce nitrogen, oxygen and argon with high quality requirements is an energy-intensive industrial process that requires large quantities of electricity. The complexity in operating these networks stems from the volatile conditions, namely electricity prices and products demands, which vary every hour, creating a clear need for computer-aided tools to attain economic and energy savings. In this article, we present a multiperiod mixed-integer linear programming (MILP) model to determine the optimal production schedule of an industrial cryogenic air separation process so as to maximize the net profit by minimizing energy consumption (which is the main contributor to the operating costs). The capabilities of the model are demonstrated by means of its application to an existing industrial process, where significant improvements are attained through the implementation of the MILP.
引用
收藏
页码:667 / 682
页数:16
相关论文
共 50 条
  • [41] Cogeneration Systems for Industrial Sector: An Optimal Power
    Al Asmar, Joseph
    Kouta, Raed
    Laghrouche, Salah
    El Assad, Joseph
    Wack, Maxime
    2014 IEEE CONFERENCE ON CONTROL APPLICATIONS (CCA), 2014, : 659 - 663
  • [42] A mixed integer linear programming model for optimal planning of bicycle sharing systems: A case study in Beijing
    Yuan, Meng
    Zhang, Qiong
    Wang, Bohong
    Liang, Yongtu
    Zhang, Haoran
    SUSTAINABLE CITIES AND SOCIETY, 2019, 47
  • [43] Optimal Dynamic Production Planning for Supply Network with Random External and Internal Demands
    Hu, Chenglin
    Bian, Junsong
    Zhao, Daozhi
    He, Longfei
    Dong, Fangqi
    MATHEMATICS, 2024, 12 (17)
  • [44] Simulation-based optimal production planning model using dynamic lead time estimation
    Sun Hoon Kim
    Jeong Woo Kim
    Young Hoon Lee
    The International Journal of Advanced Manufacturing Technology, 2014, 75 : 1381 - 1391
  • [45] Optimal economic planning for the development of waste management system by a superstructural model
    Mahyari, Khadijeh Faraji
    Rafiee, Shahin
    Keyhani, Alireza
    Jafari, Ali
    Mahyari, Mohammad Faraji
    Khorasanizadeh, Zeinab
    Mahyari, Zahra Faraji
    COMPUTERS & CHEMICAL ENGINEERING, 2022, 157
  • [46] An Optimal Operation Planning Model for High-Speed Rail Transportation
    Zhang, Xiaoqiang
    Li, Lin
    Afzal, Muhammad
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2019, 17 (9A) : 1397 - 1407
  • [47] Optimal sequence planning for multi-model reconfigurable assembly systems
    Kumar, Avinash
    Pattanaik, L. N.
    Agrawal, Rajeev
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 100 (5-8) : 1719 - 1730
  • [48] Multiobjective Long-Period Optimal Planning Model for a Grid-Connected Renewable-Battery System
    Khezri, Rahmat
    Mahmoudi, Amin
    Aki, Hirohisa
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2022, 58 (04) : 5055 - 5067
  • [49] Optimal Planning of Biodiesel Supply Chain Using a Linear Programming Model
    Valizadeh, Maryam
    Syafiie, S.
    Ahamad, I. S.
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 1280 - 1284
  • [50] Optimal production planning under uncertain market conditions
    Li, P
    Wendt, M
    Wozny, G
    PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 511 - 516