Population-based neighborhood search for job shop scheduling with interval processing time

被引:34
作者
Lei, Deming [1 ]
机构
[1] Wuhan Univ Technol, Sch Automat, Wuhan, Hubei Province, Peoples R China
基金
中国国家自然科学基金;
关键词
Neighborhood search; Interval number; Job shop scheduling; Ordered operation-based representation; PARTICLE SWARM OPTIMIZATION; QUANTUM GENETIC ALGORITHM;
D O I
10.1016/j.cie.2011.07.010
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper applies interval number theory to production scheduling for its advantage in uncertainty modeling. A job shop scheduling problem with interval processing time is first described and then a population-based neighborhood search (PNS) is presented to optimize the interval makespan of the problem. In PNS, an ordered operation-based representation is used and a decoding procedure is constructed by using operations of interval numbers, in which there are no approximate treatments. It is proved that the possible actual makespan of each schedule are contained in its interval makespan. A swap operation and binary tournament selection are applied to update the population. PNS is finally tested by using some instances and computational results show that PNS can provide better results than some methods from the literature. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1200 / 1208
页数:9
相关论文
共 20 条
[1]  
Goldberg D. E., 1991, FDN GENETIC ALGORITH
[2]   A novel competitive co-evolutionary quantum genetic algorithm for stochastic job shop scheduling problem [J].
Gu, Jinwei ;
Gu, Manzhan ;
Cao, Cuiwen ;
Gu, Xingsheng .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (05) :927-937
[3]   A novel parallel quantum genetic algorithm for stochastic job shop scheduling [J].
Gu, Jinwei ;
Gu, Xingsheng ;
Gu, Manzhan .
JOURNAL OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 2009, 355 (01) :63-81
[4]   Interval regression analysis using support vector networks [J].
Hao, Pei-Yi .
FUZZY SETS AND SYSTEMS, 2009, 160 (17) :2466-2485
[5]   A nonlinear interval number programming method for uncertain optimization problems [J].
Jiang, C. ;
Han, X. ;
Liu, G. R. ;
Liu, G. P. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 188 (01) :1-13
[6]   Job shop scheduling with stochastic processing time through genetic algorithm [J].
Lei, De-Ming ;
Xiong, He-Jing .
PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, :941-946
[7]   Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems [J].
Lei, Deming .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (1-2) :157-165
[8]   Scheduling stochastic job shop subject to random breakdown to minimize makespan [J].
Lei, Deming .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (9-12) :1183-1192
[9]   Fuzzy job shop scheduling problem with availability constraints [J].
Lei, Deming .
COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (04) :610-617
[10]   A genetic algorithm for flexible job shop scheduling with fuzzy processing time [J].
Lei, Deming .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (10) :2995-3013